After a massive landslide in March 2014 swamped State Route 53 near Oso in Snohomish County, Wash., killing 43 and seriously injuring 10, local, state and federal agency personnel, contractors and volunteers joined in the search and rescue operations.
Portland-based Puppet Labs,
which specializes in software,
worked with Swinerton Builders
and lead design firm THA
Architecture Inc. to create a customized
workplace.
The $91-million Block 44 project, located in Seattle’s South Lake Union neighborhood, consists of two office buildings—one five stories and the other six stories—for a total of 380,700 sq ft.
The Robert F. Kennedy Charter High School has its first permanent structure thanks to the June 2013 to April 2015 construction of the $4.4-million multipurpose center.
After a budget crunch caused a cancellation of an athletics-only facility, the Maricopa Community College District tasked the construction team to build a multipurpose facility.
This $11.8-million, 17-month, multiphased project rearranged Banner Boswell Medical Center’s operating room department to provide the facility with an up-to-date space designed to maximize efficiency and flow.