The leadership at Extra Space Storage wanted to expand operations at its current location and chose to remodel 61,000 sq ft on three separate floors within the existing building.
The construction of the 1,200-ft-long, 12-span Jordan River Pedestrian Bridge is the long-anticipated final link in a 106-mile-trail system that connects 34 cities from Ogden to Provo.
It’s no easy task to build a 225,000-sq-ft research building and biotechnology center on a hill with a 20-degree slope and no laydown area while working on a site surrounded by operational medical facilities.