How many people not in a history class still talk about the landmark Supreme Court case won by a Brooklyn kosher chicken company, A.L.A. Schechter Poultry Corp., in 1935?
Stacy Scopano recently joined Skender — a vertically integrated design, construction and manufacturing firm based in Chicago — as chief technology officer.
Technology and mobile connectivity have gone a long way toward fixing problems with the traditional design and construction process, but only a business model with volume production can reduce risk and deliver results that can truly offset unexpected events.
The cost of the design for a new Kansas City International Airport has nearly doubled since a developer was picked in September 2017 in a very open, if chaotic, process. Now, Chicago is going with a completely closed process to pick the designer of a new terminal at O'Hare International in a process that's just as bad.
The photo that appears on the cover of this issue of ENR, a drill rig puncturing concrete or stone at the base of a new retaining wall being built in Chattanooga, Tenn., came out on top in online voting for the image that would make the best foldout cover.
Jan. 31 is the last day to submit proposals to present at ENR’s annual FutureTech conference in June. After the submissions period ends the conference planning team will analyze the proposals for the emerging trends shaping the construction world in the years to come.