The world’s first floating nuclear powerplant is currently under construction at a shipyard in St. Petersburg. It will be 144 m long and30 m wide and house two 35-MW reactors. It will supply power in remote areas. Upon completion in 2012, crews will tow the plant to the port of Vilyuchinsk on the Kamchatka peninsula, where it will supply power to a submarine base. Russia’s United Industrial Corp. (OPK) is building the FNPP at its Baltiiskii Zavod shipyard for owner Concern Energoatom, Ukraine’s state-owned nuclear utility. Russia has extensive experience with nuclear-propelled submarines and icebreakers, and the reactors on the
A new $308-million Dept. of Energy stimulus grant will advance a California clean coal full-scale demonstration project. The $2-billion Hydrogen Energy California (HECA) will feature Integrated Gasification Combined Cycle (IGCC) technology in Kern County. HECA will convert coal and petroleum coke (a byproduct of the refining process in the Los Angeles basin) and non-potable water into hydrogen and CO2. A methanol-based process will then separate the CO2 from the hydrogen. The hydrogen will be used to fuel a 390 MW power station. The CO2 will be piped to the Elk Hills Field oil reservoir where it will be injected for
Seemingly defeating the odds, the U.S. House of Representatives narrowly approved a landmark global-warming bill on June 26 by a 219-212 vote, setting the stage for further action on the bill. But while it has a fair amount of support from a wide range of groups and is a priority of the Obama administration, the bill faces a hurdle in the Senate, where Republicans and moderate Democrats could prevent its passage. The American Clean Energy and Security Act of 2009, introduced by Rep. Henry Waxman (D-Calif.) and Rep. Edward Markey (D-Mass.), would reduce greenhouse-gas emissions by more than 80% by
Unable to find a buyer and facing expiration in 2010 of their operating permit, the owners of a controversial coal-fueled powerplant shuttered in 2005 will dismantle it starting late this year. The Mohave Generating Station near Laughlin, Nev., had operated since 1999 under a consent decree requiring air-pollution-control retrofits to improve visibility in the Grand Canyon. Photo: Babcock & Wilcox Co Decommissioning costs less than retrofitting to comply with consent decree. Decommissioning, to start in the fourth quarter, will be complete in two years at a net cost of $300 million after the sale of equipment, says Southern California Edison
After nearly four years of high-octane growth, the petroleum industry has abruptly reversed course as the collapse of the global financial crisis has driven down crude-oil prices and consumer demand, causing oil producers to hit the brakes on a bevy of pipeline, refinery, exploration and storage-facility projects. Photo:Fluor Fluor is executing a $2.2-billion heavy-oil upgrade and expansion project for Marathon Oil Corp. to add considerable processing capacity at its Detroit refinery. Photo: CB&I CB&I is fabricating more than 120 modules for an Illinois refinery expansion that will double the refinery’s capacity to 240,000 bpd. The modules will be shipped and
Although the power market has taken a hit over the past year, not all the news is bad. The Obama administration’s stimulus plan encourages the development of renewable resources and the rebuilding, expansion and modernization of the nation’s power-delivery network. Photo:AEP Wind and other renewable-energy projects gain traction. Photo: SHAW Coal-fired plants face permit obstacles. Related Links: The Top 500 Design Firms: How Long Will the Recession Last? The Top 500 Design Firms Rankings Optimism in Transportation Sector As Stimulus Provides Stability Design Firms Brace as Bottom Falls Out of Building Market Telecommunications Picks Up While Manufacturing Flounders Global Financial
The joint tenders committee of Israel’s National Infrastructure and Finance Ministries has issued an international prequalifiying tender for an offshore liquefied-natural-gas receiving terminal. The build-own-transfer tender is one of the largest issued in recent years by the by the State of Israel. The target date set for the operation of the terminal is October 2013. The decision to proceed with the terminal is part of the government’s policy to guarantee natural gas supplies to the local economy which has been rapidly switching to gas in recent years. “The tender is for the construction, operation and maintenance of the LNG terminal
A sprawling reservation in southern Ohio long associated with the nuclear industry has been selected as the site for construction of Ohio’s third nuclear powerplant. If the project goes forward, it will be one of only a few nuclear plants in the U.S. proposed for a greenfield site. Duke Energy, Charlotte, N.C.; AREVA and USEC Inc., both of Bethesda, Md.; UniStar Nuclear Energy, Baltimore; and the Southern Ohio Diversification Initiative, Piketon, Ohio, have formed an alliance to develop the country’s first so-called Clean Energy Park on the site in Piketon where USEC’s Portsmouth Gaseous-Diffusion Plant enriched uranium for powerplant fuel
Smart-grid development advanced on June 18 with the release of the National Institute of Standards and Technologies’ June 18 on standards for the smart grid. The report, prepared by the Electric Power Research Institute, Palo Alto, Cal-if., is the first of three phases in NIST’s plan to expedite development of the smart grid. NIST will accept public comments for 30 days after publication of a notice in the Federal Register announcing the report’s availability, then establish priorities, standards and action plans by early fall.
The U.S. Energy Dept. says it will build a flagship clean-coal powerplant in Illinois, reversing a previous Bush administration move to scrap the ambitious FutureGen project in favor of smaller carbon-capture and -storage projects (CCS) around the U.S. Energy Secretary Steven Chu and his industry partner, the FutureGen Industrial Alliance, a group of 20 leading power utilities and coal companies, reached agreement on the project: a 275-MW integrated gasification combined-cycle powerplant that could cost between $1.3 billion and $1.8 billion. The plant will be sited in Mattoon, Ill., 180 miles south of Chicago, and will be the first commercial-scale, coal-fired