<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0" xmlns:media="http://search.yahoo.com/mrss/">
  <channel>
    <title>Power &amp; Industrial</title>
    <description>
      <![CDATA[<style>
.taxonomy-header__description{
width: 675px !important;
max-width: 100% !important;
}
</style>
 
<p style="font-size: 12px; text-align: right;"><em>Image courtesy of: rdonar (iStock / Getty Images Plus)</em></p>
<p>Section covers power plants, transmission lines, oil and gas refineries and terminals, as well as solar- and wind-power generating infrastructure.</p> ]]>
    </description>
    <link>https://www.enr.com/rss/129-power-industrial</link>
    <language>en-us</language>
    <item>
      <title>Holtec's Indian Point Nuclear Plant Cleanup Awaits Crucial Water Release Verdict</title>
      <author>kormanr@enr.com (Richard Korman)</author>
      <description>
        <![CDATA[<p>A planned low-level radioactive water release into Hudson River tests state versus federal authority over nuclear safety.</p>]]>
      </description>
      <guid>http://www.enr.com/articles/63210</guid>
      <pubDate>Tue, 23 Jun 2026 12:19:00 -0400</pubDate>
      <link>https://www.enr.com/articles/63210-holtecs-indian-point-nuclear-plant-cleanup-awaits-crucial-water-release-verdict</link>
      <enclosure url="https://www.enr.com/ext/resources/2026/06/22/Indian-Point-water-release.webp?t=1782166309" type="image/jpeg" length="176385"/>
    </item>
    <item>
      <title>Trump Offshore Wind Buyout Deals Grow to $2.5B, With More Tumult</title>
      <author>rubind@enr.com (Debra K. Rubin)</author>
      <description>
        <![CDATA[<p>Invenergy is the latest to accept $765M buyout of wind lease areas in exchange for new gas projects, but developer still is set to build the 800-mile Grain Belt transmission line for land-based wind and solar energy.</p><br>]]>
      </description>
      <guid>http://www.enr.com/articles/63202</guid>
      <pubDate>Sun, 21 Jun 2026 13:14:05 -0400</pubDate>
      <link>https://www.enr.com/articles/63202-trump-offshore-wind-buyout-deals-grow-to-25b-with-more-tumult</link>
      <enclosure url="https://www.enr.com/ext/resources/2026/06/21/Trump_Wind-Farm.webp?t=1782156610" type="image/jpeg" length="99799"/>
    </item>
    <item>
      <title>FERC Orders Grid Operators to Rework Data Center Power Rules</title>
      <author>gottliebb@enr.com (Bryan Gottlieb)</author>
      <description>
        <![CDATA[<p>Can the grid keep pace with AI's power appetite? FERC is forcing regional operators to answer that question—and defend their plans.</p>]]>
      </description>
      <guid>http://www.enr.com/articles/63195</guid>
      <pubDate>Thu, 18 Jun 2026 16:00:00 -0400</pubDate>
      <link>https://www.enr.com/articles/63195-ferc-orders-grid-operators-to-rework-data-center-power-rules</link>
      <enclosure url="https://www.enr.com/ext/resources/2026/06/18/FERC-Order---June-18.webp?t=1781811654" type="image/jpeg" length="151382"/>
    </item>
    <item>
      <title>AI Data Centers Become City-Scale Infrastructure, Prompting New Industry Playbook</title>
      <author>gottliebb@enr.com (Bryan Gottlieb)</author>
      <description>
        <![CDATA[<p>As AI data centers reach city-scale power demands, developers, utilities and contractors are rewriting the infrastructure playbook around electricity, workforce and speed-to-power challenges nationwide.</p>]]>
      </description>
      <guid>http://www.enr.com/articles/63177</guid>
      <pubDate>Wed, 17 Jun 2026 07:41:38 -0400</pubDate>
      <link>https://www.enr.com/articles/63177-ai-data-centers-become-city-scale-infrastructure-prompting-new-industry-playbook</link>
      <enclosure url="https://www.enr.com/ext/resources/2026/06/16/Data-Center-City-Scale.webp?t=1781808030" type="image/jpeg" length="179695"/>
    </item>
    <item>
      <title>Oklahoma AG Files Suit to Stop $4B Smelter Amid GOP Primary Tensions</title>
      <author>kongv@enr.com (Vince Kong)</author>
      <description>
        <![CDATA[Giant aluminum project becomes a political football in the state governor’s race as litigation ensues.]]>
      </description>
      <guid>http://www.enr.com/articles/63167</guid>
      <pubDate>Mon, 15 Jun 2026 15:45:10 -0400</pubDate>
      <link>https://www.enr.com/articles/63167-oklahoma-ag-files-suit-to-stop-4b-smelter-amid-gop-primary-tensions</link>
      <enclosure url="https://www.enr.com/ext/resources/2026/06/15/ega-potline-3-at-al-tawheelah.webp?t=1781610107" type="image/jpeg" length="234553"/>
    </item>
    <item>
      <title>Tutor Perini Lands $652M Grid Upgrade at Naval Base Guam </title>
      <author>gottliebb@enr.com (Bryan Gottlieb)</author>
      <description>
        <![CDATA[<p>Critical U.S. Navy power infrastructure will be moved underground as part of a flurry of military construction activity at the U.S. base in the Pacific.</p>]]>
      </description>
      <guid>http://www.enr.com/articles/63162</guid>
      <pubDate>Mon, 15 Jun 2026 12:37:54 -0400</pubDate>
      <link>https://www.enr.com/articles/63162-tutor-perini-lands-652m-grid-upgrade-at-naval-base-guam</link>
      <enclosure url="https://www.enr.com/ext/resources/2026/06/14/Tutor-Perini---NAVFAC.webp?t=1782144369" type="image/jpeg" length="207091"/>
    </item>
    <item>
      <title>Saipem Wins $1B Aramco Gas Compression Plant Contract in Saudi Arabia</title>
      <author>gottliebb@enr.com (Bryan Gottlieb)</author>
      <description>
        <![CDATA[<p>Why did Aramco select Saipem for the first project under its national EPC 'champion' program—and what does it signal for Saudi delivery models?</p>]]>
      </description>
      <guid>http://www.enr.com/articles/63144</guid>
      <pubDate>Thu, 11 Jun 2026 12:20:00 -0400</pubDate>
      <link>https://www.enr.com/articles/63144-saipem-wins-1b-aramco-gas-compression-plant-contract-in-saudi-arabia</link>
      <enclosure url="https://www.enr.com/ext/resources/2026/06/11/Saipem-Aramco-2.webp?t=1781188051" type="image/jpeg" length="207076"/>
    </item>
    <item>
      <title>Coal Energy Projects Get New Trump Boost With $850M Federal Funding Injection</title>
      <author>rubind@enr.com (Debra K. Rubin)</author>
      <description>
        <![CDATA[<p>But will added taxpayer funds for new, reopened and upgraded coal power plants be enough to meet growing energy demand, attract private investors and users and reinvigorate a long ailing segment?</p><br>]]>
      </description>
      <guid>http://www.enr.com/articles/63110</guid>
      <pubDate>Fri, 05 Jun 2026 12:25:43 -0400</pubDate>
      <link>https://www.enr.com/articles/63110-coal-energy-projects-get-new-trump-boost-with-850m-federal-funding-injection</link>
      <enclosure url="https://www.enr.com/ext/resources/2026/06/04/NarylandWarriorRuncoalplant.webp?t=1781367127" type="image/jpeg" length="224891"/>
    </item>
    <item>
      <title>UPDATED Seven States Sue Feds Over $928B Offshore Wind Cancelled Lease Deal</title>
      <author>rubind@enr.com (Debra K. Rubin)</author>
      <description>
        <![CDATA[<p>Clean energy legal actions get second wind as June 6 federal court decision rejects Trump rules for how wind-solar projects can use key federal tax credits during construction—following by days state attorneys general lawsuit to nullify a wind developer's $1B government lease buyout they claim is “blatantly unlawful.”&nbsp;</p>]]>
      </description>
      <guid>http://www.enr.com/articles/63107</guid>
      <pubDate>Thu, 04 Jun 2026 15:22:00 -0400</pubDate>
      <link>https://www.enr.com/articles/63107-updated-seven-states-sue-feds-over-928b-offshore-wind-cancelled-lease-deal</link>
      <enclosure url="https://www.enr.com/ext/resources/2026/06/04/OFFSHOREwindCROPPED-EasrCoastmap.webp?t=1780775003" type="image/jpeg" length="87624"/>
    </item>
    <item>
      <title>Fluor and JGC Get Nod to Move Ahead on Giant LNG Canada Next Phase </title>
      <author>rubind@enr.com (Debra K. Rubin)</author>
      <description>
        <![CDATA[<p>Contractor JV will expand British Columbia export terminal, which has become key hub for shipments to Asia, with final investment decision expected this year,</p>]]>
      </description>
      <guid>http://www.enr.com/articles/63097</guid>
      <pubDate>Wed, 03 Jun 2026 17:40:00 -0400</pubDate>
      <link>https://www.enr.com/articles/63097-fluor-and-jgc-get-nod-to-move-ahead-on-giant-lng-canada-next-phase</link>
      <enclosure url="https://www.enr.com/ext/resources/2026/06/03/lng-canada-FLUOR.webp?t=1780775004" type="image/jpeg" length="178560"/>
    </item>
    <item>
      <title>Prolonged Strait of Hormuz Closure Could Upend Global Economies, Energy Sector Survey Says</title>
      <author>rubind@enr.com (Debra K. Rubin)</author>
      <description>
        <![CDATA[<p>Shutdown of shipping through Persian Gulf is "far more than an energy crisis,” says Wood-Mackenzie analysis—as contractor McDermott International sees growth in region infrastructure restoration work.</p>]]>
      </description>
      <guid>http://www.enr.com/articles/63058</guid>
      <pubDate>Wed, 27 May 2026 15:22:00 -0400</pubDate>
      <link>https://www.enr.com/articles/63058-prolonged-strait-of-hormuz-closure-could-upend-global-economies-energy-sector-survey-says</link>
      <enclosure url="https://www.enr.com/ext/resources/2026/05/27/Strait_of_Hormuz.-credit-NASA.public-domain-via-Wikimedia-jpg.webp?t=1780023154" type="image/jpeg" length="187689"/>
    </item>
    <item>
      <title>Denver Looks to Sewers, Geothermal Wells for Downtown Energy Network</title>
      <author>gottliebb@enr.com (Bryan Gottlieb)</author>
      <description>
        <![CDATA[<p>Denver is testing whether sewer heat, geothermal wells and district thermal infrastructure can retrofit dense downtowns without requiring major electrical-system expansion.</p>]]>
      </description>
      <guid>http://www.enr.com/articles/63057</guid>
      <pubDate>Wed, 27 May 2026 13:23:58 -0400</pubDate>
      <link>https://www.enr.com/articles/63057-denver-looks-to-sewers-geothermal-wells-for-downtown-energy-network</link>
      <enclosure url="https://www.enr.com/ext/resources/2026/05/26/Denver-Sewer-Power-2.webp?t=1780002287" type="image/jpeg" length="201319"/>
    </item>
    <item>
      <title>EPA May Allow Some Large Facility Pre-Construction Without a Full Clean Air Permit</title>
      <description>
        <![CDATA[<p>The agency has proposed allowing construction to
 begin on non-emitting components or structures for power generation, 
data centers and manufacturing under the federal new source review program. </p><br>]]>
      </description>
      <guid>http://www.enr.com/articles/63056</guid>
      <pubDate>Tue, 26 May 2026 17:10:22 -0400</pubDate>
      <link>https://www.enr.com/articles/63056-epa-may-allow-some-large-facility-pre-construction-without-a-full-clean-air-permit</link>
      <enclosure url="https://www.enr.com/ext/resources/2026/05/26/EPA.webp?t=1779883847" type="image/jpeg" length="243259"/>
    </item>
    <item>
      <title>EPA Scales Back Limits on PFAS Chemicals in Drinking Water</title>
      <author>mcfarlandp@enr.com (Pam McFarland)</author>
      <description>
        <![CDATA[<p>US Environmental Protection Agency wants to maintain legally enforceable limits on the most-studied types of "forever" chemicals known as PFAS but would roll back standards established for four other types, including GenX.&nbsp;</p>]]>
      </description>
      <guid>http://www.enr.com/articles/63045</guid>
      <pubDate>Fri, 22 May 2026 12:46:51 -0400</pubDate>
      <link>https://www.enr.com/articles/63045-epa-scales-back-limits-on-pfas-chemicals-in-drinking-water</link>
      <enclosure url="https://www.enr.com/ext/resources/2026/05/22/EPA-headquartersEPA.webp?t=1779903555" type="image/jpeg" length="214147"/>
    </item>
    <item>
      <title>From the Archives: August 16, 1984</title>
      <author>lewisw@enr.com (Scott Lewis)</author>
      <description>
        <![CDATA[<p>This 1984 cover depicts the world&rsquo;s first full-scale tension leg platform.</p>]]>
      </description>
      <guid>http://www.enr.com/articles/63048</guid>
      <pubDate>Fri, 22 May 2026 12:00:00 -0400</pubDate>
      <link>https://www.enr.com/articles/63048-from-the-archives-august-16-1984</link>
      <enclosure url="https://www.enr.com/ext/resources/2026/05/22/ENRAugust-16-1984cover.webp?t=1779465972" type="image/jpeg" length="80711"/>
    </item>
    <item>
      <title>Clayco Partners With Deep Atomic for DOE Nuclear-Powered Data Center Proposal</title>
      <author>yodersj@enr.com (Jeff Yoders)</author>
      <description>
        <![CDATA[<p>Design-build firm is part of a consortium that aims to build a nuclear-powered data center at the Idaho National Laboratory, a federal research site.</p>]]>
      </description>
      <guid>http://www.enr.com/articles/63037</guid>
      <pubDate>Thu, 21 May 2026 08:51:35 -0400</pubDate>
      <link>https://www.enr.com/articles/63037-clayco-partners-with-deep-atomic-for-doe-nuclear-powered-data-center-proposal</link>
      <enclosure url="https://www.enr.com/ext/resources/2025/01/15/CHICAGOQUANTUM.webp?t=1779477343" type="image/jpeg" length="246744"/>
    </item>
    <item>
      <title>Investors Back US Renewable Energy Projects But Want Market Uncertainties Fixed</title>
      <author>rubind@enr.com (Debra K. Rubin)</author>
      <description>
        <![CDATA[<p><span style="font-size: 14px;"><span style="font-family: Arial,Helvetica,sans-serif;">Investors and developers are bullish on clean energy to quickly meet nation's power demand surge, b</span></span><span style="font-size: 14px;"><span style="font-family: Arial,Helvetica,sans-serif;">ut federal actions that undermine projects and remain vague on tax credit rules, as well as slow connection to the grid, could hamper markets.</span></span></p>]]>
      </description>
      <guid>http://www.enr.com/articles/63027</guid>
      <pubDate>Wed, 20 May 2026 12:10:00 -0400</pubDate>
      <link>https://www.enr.com/articles/63027-investors-back-us-renewable-energy-projects-but-want-market-uncertainties-fixed</link>
      <enclosure url="https://www.enr.com/ext/resources/2026/05/20/2026ACOREnance-Forum-3-copy.webp?t=1780023154" type="image/jpeg" length="247073"/>
    </item>
    <item>
      <title>Power Giants NextEra Energy and Dominion Energy Eye $67B Link</title>
      <author>rubind@enr.com (Debra K. Rubin)</author>
      <description>
        <![CDATA[<p>Florida-based NextEra said May 19 it seeks to buy Virginia-based utiiity Dominion to create "one of the world’s largest energy infrastructure companies.”</p>]]>
      </description>
      <guid>http://www.enr.com/articles/63015</guid>
      <pubDate>Mon, 18 May 2026 16:55:57 -0400</pubDate>
      <link>https://www.enr.com/articles/63015-power-giants-nextera-energy-and-dominion-energy-eye-67b-link</link>
      <enclosure url="https://www.enr.com/ext/resources/2026/05/18/NextEra-Dominion-Merger.webp?t=1779185996" type="image/jpeg" length="323075"/>
    </item>
    <item>
      <title>EPA Moves to Ease Coal Plant Wastewater Rules, Raising Questions for Compliance Work</title>
      <author>gottliebb@enr.com (Bryan Gottlieb)</author>
      <description>
        <![CDATA[<p>EPA’s proposed coal wastewater rule overhaul could reshape compliance work and environmental infrastructure planning as utilities reassess projects amid regulatory uncertainty and shifting grid demands.</p>]]>
      </description>
      <guid>http://www.enr.com/articles/63005</guid>
      <pubDate>Fri, 15 May 2026 12:45:42 -0400</pubDate>
      <link>https://www.enr.com/articles/63005-epa-moves-to-ease-coal-plant-wastewater-rules-raising-questions-for-compliance-work</link>
      <enclosure url="https://www.enr.com/ext/resources/2026/05/15/EPA-Rule-Change.webp?t=1779139907" type="image/jpeg" length="149185"/>
    </item>
    <item>
      <title>Jacobs Expands EPCM Role With Hut 8's 1-GW Texas AI Campus</title>
      <author>gottliebb@enr.com (Bryan Gottlieb)</author>
      <description>
        <![CDATA[<p>Jacobs' work for Hut 8 goes beyond an EPCM award as Beacon Point’s scale reshapes design assumptions, utility planning and grid rules.</p>]]>
      </description>
      <guid>http://www.enr.com/articles/63004</guid>
      <pubDate>Fri, 15 May 2026 11:25:04 -0400</pubDate>
      <link>https://www.enr.com/articles/63004-jacobs-expands-epcm-role-with-hut-8s-1-gw-texas-ai-campus</link>
      <enclosure url="https://www.enr.com/ext/resources/2026/05/14/Beacon-Point.webp?t=1779099767" type="image/jpeg" length="200592"/>
    </item>
    <item>
      <title>Grid Operator PJM Interconnection Aims Changes to Speed New Capacity Adds</title>
      <description>
        <![CDATA[<p>Power grid operator announced that its reopened queue of proposed new interconnections 
includes applications from 811 projects totaling 220 GW.</p><br>]]>
      </description>
      <guid>http://www.enr.com/articles/63001</guid>
      <pubDate>Thu, 14 May 2026 16:15:00 -0400</pubDate>
      <link>https://www.enr.com/articles/63001-grid-operator-pjm-interconnection-aims-changes-to-speed-new-capacity-adds</link>
      <enclosure url="https://www.enr.com/ext/resources/2026/05/14/ISO-RTO-Operating-Region_pjm-SustinableFERC.webp?t=1778906415" type="image/png" length="132954"/>
    </item>
    <item>
      <title>FERC Weighs Federal Oversight of AI Data Center Grid Connections</title>
      <author>gottliebb@enr.com (Bryan Gottlieb)</author>
      <description>
        <![CDATA[<p>Federal Energy Regulatory Commission plans action on proposal to expand oversight of AI-driven data center grid connections as utilities accelerate transmission upgrades.</p>]]>
      </description>
      <guid>http://www.enr.com/articles/62997</guid>
      <pubDate>Wed, 13 May 2026 15:23:24 -0400</pubDate>
      <link>https://www.enr.com/articles/62997-ferc-weighs-federal-oversight-of-ai-data-center-grid-connections</link>
      <enclosure url="https://www.enr.com/ext/resources/2026/05/13/FERC-June-Hearing.webp?t=1778727028" type="image/jpeg" length="299238"/>
    </item>
    <item>
      <title>Romania $4.7B Offshore Gas Project Is Set to Make It Largest EU Producer, Cutting Off Russia</title>
      <description>
        <![CDATA[<p>Italy-based contractor Saipem holds $1.75B award to build 160-km, 30-in. pipeline to transport gas to European Union network, and other infrastructure, with Black Sea project set to cut dependence on Russian supply.</p>]]>
      </description>
      <guid>http://www.enr.com/articles/62985</guid>
      <pubDate>Tue, 12 May 2026 13:57:00 -0400</pubDate>
      <link>https://www.enr.com/articles/62985-romania-47b-offshore-gas-project-is-set-to-make-it-largest-eu-producer-cutting-off-russia</link>
      <enclosure url="https://www.enr.com/ext/resources/2026/05/12/neptunGAS.OMVPETROM.ROMANIA.SAIPEM.-deep-copy.webp?t=1778668462" type="image/jpeg" length="153973"/>
    </item>
    <item>
      <title>Bechtel Boosts Role in Nuclear Power Resurgence With New Union Apprenticeship Pact</title>
      <description>
        <![CDATA[<p>The global contractor signed a memorandum of understanding with North America’s Building Trades Unions to advance union apprenticeship training to deliver advanced nuclear projects at scale.</p>]]>
      </description>
      <guid>http://www.enr.com/articles/62964</guid>
      <pubDate>Mon, 11 May 2026 09:12:00 -0400</pubDate>
      <link>https://www.enr.com/articles/62964-bechtel-boosts-role-in-nuclear-power-resurgence-with-new-union-apprenticeship-pact</link>
      <enclosure url="https://www.enr.com/ext/resources/2026/Bechtel-Georgia-Power-Unit-4.webp?t=1778508493" type="image/png" length="615945"/>
    </item>
    <item>
      <title>ITER Magnet Milestone Tests Fusion’s Construction Supply Chain</title>
      <author>gottliebb@enr.com (Bryan Gottlieb)</author>
      <description>
        <![CDATA[<p>As ITER moves closer to first plasma, the megaproject’s sprawling fabrication and supply-chain network increasingly is shaping the future of commercial fusion construction.</p>]]>
      </description>
      <guid>http://www.enr.com/articles/62975</guid>
      <pubDate>Fri, 08 May 2026 10:19:00 -0400</pubDate>
      <link>https://www.enr.com/articles/62975-iter-magnet-milestone-tests-fusions-construction-supply-chain</link>
      <enclosure url="https://www.enr.com/ext/resources/2026/05/07/ITER.webp?t=1778351489" type="image/jpeg" length="302535"/>
    </item>
    <item>
      <title>STV Chief Announces Plan to Launch Power Business Line </title>
      <description>
        <![CDATA[<p>In an ENR Groundbreakers interview, Greg Kelly says the business line will position the AEC consultant to capitalize on energy demands fueled by data center projects.</p><br>]]>
      </description>
      <guid>http://www.enr.com/articles/62967</guid>
      <pubDate>Fri, 08 May 2026 09:00:00 -0400</pubDate>
      <link>https://www.enr.com/articles/62967-stv-chief-announces-plan-to-launch-power-business-line</link>
      <enclosure url="https://www.enr.com/ext/resources/2026/ENR-Groundbreakers-STV-CEO-Greg-Kelly-(1).webp?t=1778508493" type="image/png" length="364149"/>
    </item>
    <item>
      <title>Feds Propose Framework to Push Nuclear Microreactor Deployment</title>
      <author>rubind@enr.com (Debra K. Rubin)</author>
      <description>
        <![CDATA[<p>Published May 1 in the Federal Register with a 42-day comment, the proposed Part 57 rule outlines a “streamlined, risk-informed and 
flexible licensing pathway” NRC claims could save up to $11.8 
billion and shorten construction permit and operating license timelines 
to one year or less.</p>]]>
      </description>
      <guid>http://www.enr.com/articles/62971</guid>
      <pubDate>Thu, 07 May 2026 14:45:00 -0400</pubDate>
      <link>https://www.enr.com/articles/62971-feds-propose-framework-to-push-nuclear-microreactor-deployment</link>
      <enclosure url="https://www.enr.com/ext/resources/2026/05/07/MICROREACTORkaleidosRadiant.webp?t=1778351489" type="image/jpeg" length="118141"/>
    </item>
    <item>
      <title>Subsea 7 Wins Bay du Nord FEED Award as Big Saipem Merger Looms </title>
      <author>rubind@enr.com (Debra K. Rubin)</author>
      <description>
        <![CDATA[<p>Atlantic Canada $10.25B offshore oil drilling project awards Euro drilling firm detailed engineering award—as its integration deal is months away from closing.with Italy-based EPC giant that despite the current Gulf conflict, reports "strong progress" on all its Middle East projects and $1.3B in Q1 revenue in the region.</p>]]>
      </description>
      <guid>http://www.enr.com/articles/62965</guid>
      <pubDate>Thu, 07 May 2026 10:49:00 -0400</pubDate>
      <link>https://www.enr.com/articles/62965-subsea-7-wins-bay-du-nord-feed-award-as-big-saipem-merger-looms</link>
      <enclosure url="https://www.enr.com/ext/resources/2026/05/07/baydunord.rendering.webp?t=1778166235" type="image/jpeg" length="160535"/>
    </item>
    <item>
      <title>Ontario's $9.8B Transmission Plan Targets Toronto Grid Bottleneck</title>
      <author>gottliebb@enr.com (Bryan Gottlieb)</author>
      <description>
        <![CDATA[<p data-pm-slice="1 1 []">As Toronto's grid reaches its limits, Ontario's electricity system operator has proposed a $9.8 billion plan to address the issue, potentially establishing one of North America’s largest high-voltage construction programs.</p>]]>
      </description>
      <guid>http://www.enr.com/articles/62944</guid>
      <pubDate>Tue, 05 May 2026 16:00:00 -0400</pubDate>
      <link>https://www.enr.com/articles/62944-ontarios-98b-transmission-plan-targets-toronto-grid-bottleneck</link>
      <enclosure url="https://www.enr.com/ext/resources/2026/05/05/IESO-Story.webp?t=1778064539" type="image/jpeg" length="265697"/>
    </item>
    <item>
      <title>US-Israel Joint Venture Unveils $1B Desalination Plant Plan in South Texas</title>
      <author>kongv@enr.com (Vince Kong)</author>
      <description>
        <![CDATA[<p>Team bets big on seawater desalination as region water supply pressure intensifies, but few project technical details are released.</p>]]>
      </description>
      <guid>http://www.enr.com/articles/62945</guid>
      <pubDate>Tue, 05 May 2026 15:25:08 -0400</pubDate>
      <link>https://www.enr.com/articles/62945-us-israel-joint-venture-unveils-1b-desalination-plant-plan-in-south-texas</link>
      <enclosure url="https://www.enr.com/ext/resources/2026/05/05/South_Padre_Island.webp?t=1778351489" type="image/jpeg" length="200991"/>
    </item>
  </channel>
</rss>
