The 645-mile pipeline, dubbed "Keystone Light" in reference to Keystone XL line cancelled in 2021 after former President Joe Biden revoked its US permit, would move up to 550,000 barrels per day of Canadian crude into American markets
The Trump permit enables construction of a 645-mile Canada-to-Wyoming crude pipeline connecting to one in Alberta, but challenges from environmental groups as well as further state and federal reviews are still ahead.
Walbridge achieved 40% projected materials savings using materials management platform to rethink everything from recycling to truck trips on Ford BlueOval project.
NJ Gov. Mikie Sherrill scrapped the original controversial $10.7B twin-span bridge build in tight urban area advanced by her predecessor after local opposition.
Materials producer Holcim will open in 2028 what it says is the world's first fully electric cement clinker plant, while KBR and Mott McDonald are engineering the first global facility in Amsterdam to annually import 200,000 metric tons of
liquid hydrogen and export 1.8M metric tons of carbon dioxide.