Construction is progressing on a $52-million operations, maintenance and administrative building for Parker Water & Sanitation District (PWSD) near Rueter-Hess Reservoir, three miles west of Parker, Colo.
Almost 20 years of effort went into Enmarket Arena, the 9,500-seat, 215,000-sq-ft arena, which stands as the largest capital expenditure in Savannah’s history.
This comprehensive adaptive reuse project required lifting a 60,000-sq-ft steel-framed World War Two-era warehouse 12 feet in the air to create a workspace.
The 135,000-sq-ft building marked several milestones—the first multi-story mass timber building in California, the first mass timber building in San Francisco and the longest single-span cantilever floorplates in North America.
This two-story, 78,000-sq-ft pharmaceutical manufacturing facility located at a prominent corner of the owner’s 200-acre headquarters campus was designed to produce innovative drugs.
Innovator and 2016 ENR Award of Excellence Winner who propelled a global building movement through the Living Building Challenge integrates the 10-person McClennan Design into the 2,400-employee design giant.
The first large-scale prefabricated and multimodular Current Good Manufacturing Practices (cGMP) manufacturing facility built in the nation also helps the National Cancer Institute produce an experimental therapy.