What firms are part of the construction team tapped for the United Center-area redevelopment project expected to transform 55 acres over the next 15 years?
With 15 years in the industry and a role as associate principal at Thornton Tomasetti, Chase Anderson has built a career at the forefront of structural forensics and post‑disaster response.
Spanning three floors and totaling 113,000 sq ft, the project supports the owner’s continued growth in the biotechnology sector by providing both office space and an assembly hub.
As the world’s first vertically stacked film studio, the 145-ft-tall, 775,000-sq-ft structure yields eleven 60-ft-tall column-free sound stages—five at grade and six two stories above, each spanning roughly 18,000 sq ft.
The design and construction of the 150,000-sq-ft facility presented a range of logistical and technical challenges shaped in large part by its prominent urban location in downtown Washington, D.C.
The City of Chicago has advanced a $7-billion, 15-year plan to redevelop 55 acres around Chicago's United Center with housing, retail, entertainment space and a public plaza.