Constructed on an 80-acre greenfield site, this 365,000-sq-ft plant increases Hill’s pet food production capacity with custom process and quality systems that incorporate new methods for mixing powders and liquids and for handling meat.
This project converted a 1-million-sq-ft speculative warehouse into a 600,000-sq-ft industrial dry cleaning, laundry, office and distribution facility.
Transforming a long-vacant retail building into a 59,000-sq-ft industrial manufacturing facility using cutting-edge technology and materials required elaborate HVAC and electrical systems to support interior pressurization, a dense equipment layout and extra operational redundancy.
The project included a new manufacturing line, increased warehouse and distribution capacity, office space for the custom storage container manufacturer, refrigerated containers, containerized shelters and modular building systems.
The team developed 110 acres and constructed a plant with the goal of improving Cottrell Trailer’s production capabilities, ranging from painting to assembly of its auto-hauler fleets.
United Therapeutics’ latest distribution warehouse may be the second net-zero building constructed on the biotechnology company’s campus in Durham, N.C.’s Research Triangle Park, but it’s still a one-of-a-kind project.
As part of an effort to help Maersk expand its presence in the U.S., design-builder Primus Builders constructed an $85.7-million, 295,000-sq-ft cold storage distribution facility for cold storage real estate developer RL Cold.
Already racking up multiple awards, Wake Technical Community College’s central energy plant is not only electrifying classrooms and equipment for its more than 70,000 students, it’s teaching them about geothermal and solar energy too.
At 1 million sq ft, this manufacturing facility was designed and built to produce and distribute the owner’s Sterling Vikrell bath and shower fixture lines.