It's not clear why one team opted out of competition for the estimated $11 billion I-270/Beltway expansion in a major commuter corridor outside Washington, D.C.
The joint venture will complete engineering work on the new $930-million U.S. Route 181/Harbor Bridge in Texas, taking over from original engineer-of-record FIGG.
More than six months after design work was halted on its signature cable-stayed main spans, construction of the new Harbor Bridge in Corpus Christi, Texas, has pressed ahead, even as uncertainties shroud its ultimate cost and completion schedule.
Innovative box-jacking method from an Italian engineering firm is deployed for the first time in the U.S. for LIRR's grade-crossing elimination project.