An eleventh hour intervention by N.Y. Gov. Cuomo may allow rail service for big storm repair, but the abrupt change in project scope is facing some team pushback.
The East Valley Water District broke ground on the Sterling Natural Resource Center, a design-build wastewater treatment project 65 miles east of Los Angeles
The team of Superior Construction Co. and WSP has been selected for the $90-million design-build replacement of the Interstate 20 bridges spanning the Augusta Canal and Savannah River on the Georgia-South Carolina border.
Transportation infrastructure stakeholders say it’s a good time to be in the business, despite myriad challenges, and they are holding out hope for bipartisan agreements on federal funding and regulatory reform.
The external steelwork diagrid of this 220-meter-tall residential building has allowed its construction on a constrained London site just 13 m above twin metro tunnels.