The Texas Department of Transportation temporarily closed the main lanes of IH-35 at the IH-35/FM 2063 interchange for two days recently to demolish the existing FM 2063 bridge over IH-35 in Waco.

The demolition was part of a multi-phase $88-million reconstruction project, which is projected for completion in fall 2011.