Chavez Building Getting a More Modern, Efficient Exterior Skin
• Coordinated building envelope/energy conservation strategies
• Improved office tenant access to daylight and view
• Interior operable window shades for control of solar heat gain, light and glare
• Low-VOC, recycled and regionally sourced building materials and interior finishes
• Forest Stewardship Certified wood paneling
• Light-colored “cool” roof overlay
• Mechanical upgrades with a full digital control system and replacement to variable frequency drives and variable air volume equipment
• Attention to site lighting, water quality and the “heat-island effect”
• A solar sculpture with a 115 kW photovoltaic system
• New public plaza integrating existing artwork.
The design-build team includes: GE Johnson (design-builder); Tryba Architects (design architect and architect-of-record); Jacobs (construction manager for the GSA); Martin/Martin (structural engineers), BCER Engineering (mechanical, electrical and plumbing engineer), Walker Parking (parking consultant), and ME Group (commissioning agent for GSA).


