Building 24 is an 8,800-sq-ft single-story wood- and steel-framed building with a 1,700-sq-ft mezzanine located at the Chevron Richmond Technology Center in Richmond. It was originally built in the early 1980s as a lab facility and was converted into office and warehouse space in the 1990s. In 2008, Chevron identified the need for an Operations Control Center (OCC) at the RTC to support complex research units across the campus.