ENR’s Critical Path Podcast delivers insights from leading industry experts and decision-makers about the latest construction industry innovations, issues and developments.
Water tank owners no longer have to choose between durability or sustainability when using 100% solids linings. Extending service lives to 20 to 30 years, these materials offer sustainability, lower lifecycle costs and boost worker safety.
Speakers:
Paul Trautmann, Market Director for Water Infrastructure, Sherwin-Williams Protective & Marine
Steven Roetter, Market Segment Manager for Water Infrastructure, Sherwin-Williams Protective & Marine
Chip Stein, President, Tank Industry Consultants
Dominic Brancaccio, Chief Facilities Engineer, Fairfax Water
From the inception of the critical path, to newer methods such as the line of balance, Founder and CEO of ALICE Technologies René Morkos brings a month-long series of scheduling discussions to a close with Jeff Yoders.
Francisco “Frio” Iorio discusses automating electrical system design with Augmenta and all things construction technology related with Aileen Cho and Jeff Yoders.
ENR Deputy Editor Aileen Cho chats with Jim Lockwood and Antonion Dinis about the iconic bridge engineer, including the centennial memorial of his birthday in France.
Planera Co-Founder and CEO Nitin Bhandari catches up with Aileen Cho and Jeff Yoders at ENR’s FutureTech conference in San Francisco and talks all forms of scheduling, from the critical path to the line of balance.
Buildots co-founder talks with Jeff Yoders about the scheduling platform’s new AI-powered tool to automate the line-of-balance scheduling method, replacing manual calculations and spreadsheets.