The contractor responsible for manufacturing defective concrete panels for the Silver Line Metro extension in northern Virginia was banned from bidding federal transportation projects for three years.
Building, closed since the event that killed 11 public works and public utilities employees and a contractor, is part of a major city facility upgrade.
As demolition work ramps up on storm-damaged span, Florida agency remains mum on the impact to the $430-million bridge replacement program's original completion schedule.
Outer bands from Hurricane Delta reportedly caused the contractor's erosion-control measures to fail, allowing red clay to flow into the surrounding bay.
Hampton Roads Connector Partners (HRCP)—a design-build joint venture of Dragados USA, Vinci, Dodin Campenon Bernard and Flatiron Constructors—has the go-ahead to begin the 55-month process of adding twin two-lane tunnels parallel to existing tubes linking Hampton and Norfolk, Va.
Big boulders are causing big headaches for Virginia’s Chesapeake Bay Bridge-Tunnel expansion project, adding to other issues that have pushed the $756 million effort two years behind its original 2022 completion target.