The nine-story, 354,000-sq-ft facility advances cutting-edge biomedical research and next-generation medical education while also setting a new standard for sustainability.
The $21.6-million, 35,418-sq-ft facility features a full-size multi-use gymnasium with rollout spectator seating, 8,100 sq ft of multiuse event space, flexible activity spaces, a commercial teaching kitchen, modern locker rooms and a gymnasium for classes.
Working within a 14-day window, and culminating in a planned 96-hour complete halt of train operations, the team successfully replaced a 70-year-old structurally deficient bridge located along a remote section of a critical cross-border freight rail route.
Built on an aggressive 21-month schedule, the $45.4-million multi-family residential development features more than 160 apartment homes in three mid-rise buildings.
Located in Worcester’s emerging Canal District and directly adjacent to the iconic Polar Park baseball stadium, The Cove offers more than 170 upscale, market-rate apartments,
Located on a former college campus, the 208,000-sq-ft development includes nearly 160 residences across three levels of care—independent living, assisted living and memory care—creating a continuum of support within a cohesive and connected community.
Located on a 25-acre site, the 114,000-sq-ft facility enhances the owner’s ability to research, develop and manufacture advanced veterinary diagnostic products, with capacity for future growth.
Constructed on a 20-acre site already occupied by an existing school that remained fully operational throughout construction, the new 422,000-sq-ft facility required a carefully phased plan to maintain safety and limit disruption to students and staff.