Nearly three months after Hurricane Harvey struck Texas, CH2M has been selected to assist with repairs to
damage caused by the storm at two
Naval air stations.
The U.S. Army Corps of Engineers is embarking on a $4.53 million project to replace a 400-ft-long section of Mississippi River flood wall behind the French Market.
The construction, engineering and fabrication issues raised by Christopher Hartz and detailed here by ENR applied to both the Plant Vogtle and V.C. Summer nuclear expansion projects.