When this animal shelter was experiencing capacity issues and needed renovations and additions, the Humane Society turned to GE Johnson without a bidding process thanks to an already established relationship from a past renovation and ongoing volunteer work.
This $5.8-million design-build project transformed an aging 1960s-era weight room in the north lower level of the Moby Arena Complex into a new 8,400-sq-ft locker room for Colorado State University’s basketball teams.
Completed in February 2023, this 19,000-sq-ft building expansion includes a 7,100-sq-ft data center/switch room, electrical rooms, uninterruptible power supply rooms and other services to support Verizon’s 5G network in Aurora and the surrounding area.
This comprehensive district-wide renovation and expansion touched every campus in the Yuma School District, including its pre-K to 8th grade school, high school, administrative offices and bus barn, modernizing the facilities and enhancing both safety and security.
Scope of work on this $8.6-million bridge rehabilitation included replacing the two existing Platte Avenue bridges over Sand Creek with a single bridge and adding sidewalks along the north and south sides of the street over the creek.
At $1.3 billion, Central 70 is Colorado’s largest highway infrastructure project in state history. Made possible through a public-private partnership, the project rebuilt 10 miles of Interstate 70, added an express lane in each direction, removed a 50-year-old viaduct and lowered the interstate below grade between Brighton and Colorado boulevards.
To provide a new patient care unit for forensic services within the Memorial Hospital Central Emergency Dept. in Colorado Springs, crews performed a 3,400-sq-ft build-out of existing shelled space.
A $120-million greenfield orthopedic and spine hospital in northern Colorado Springs features 72 beds, 10 intensive care unit beds, 10 specialty-size operating rooms, a 14-bed emergency department and imaging with computed tomography and ultrasound.