The construction of the 1,200-ft-long, 12-span Jordan River Pedestrian Bridge is the long-anticipated final link in a 106-mile-trail system that connects 34 cities from Ogden to Provo.
This design-build highway project improved the efficiency of the Bangerter Highway and Redwood Road corridors while delivering long-term value to the community.