Spanning nearly 1,400 acres, the 275-MW solar farm and 75-MW battery storage system stands as a testament both to renewable energy and respect for the land and people of the Moapa Band of Paiute Indians.
Completed in January 2023, Las Vegas’ first and only independent film house, live music venue and storytelling arena is a two-story, 14,457-sq-ft facility that features a main theater, an outdoor jazz terrace and a courtyard.
With a design inspired by the Sonoran desert, Atlantic Aviation’s new hangar features a facade composed of a random pattern of vertical and diagonal reveal joints and an undulating parapet line that together create an abstract composition that complements the nearby McDowell Mountain Range.
Arizona’s first mass timber multistory Class-A office building spans 184,000 sq ft and features cross-laminated timber (CLT) slabs as well as glulam beams and columns as the main structural components.
In just 15 months, Fluor built a temporary processing village to house and support a total of 7,219 guests as part of this $352-million Operation Allies Welcome (OAW) project.
Contractors in the Tucson area are “extremely busy,” Goodwin says, and Southern Arizona has had larger construction projects in the last 12 months than in the same time period since 2013.
Announced by President Joe Biden Sept. 28 at the Tempe Center for the Arts, the McCain National Library at Arizona State University will honor the life and legacy of Sen. John McCain.
General contractor Stevens Leinweber Construction Inc. and design firm Ware Malcomb completed the new downtown Scottsdale, Ariz., headquarters for property technology firm Lessen Inc.