Gaps in construction oversight and in owner TC Energy's standards, policies and administrative controls were the root cause of last year's massive spill into Kansas waterways, says a new third-party independent analysis, with redacted details.
Suit contends that city and Metropolitan Water Reclamation District mishandled operation of river floodgates, causing damage when more than 1 million gallons of water flooded the skyscraper during a 2020 rainstorm.
A Chicago infrastructure engineering firm is partnering with an elementary school to encourage students to love math and science and foster a new generation of engineers.
A 110-year-old embankment wall will come tumbling down later this year as part of a major enhancement to Chicago Transit Authority’s (CTA) $2.1-billion project to modernize the Red and Purple lines.
The economy is slowing, but ENR Midwest’s Top Design Firms showed robust growth over last year with participating firms reporting $8.1 billion in total regional revenue.