The BlueOval City plant was designed as one of the largest auto manufacturing plants in the U.S. and among the first to co-locate EV assembly and battery manufacturing at the same site.
High winds, storm surge and a collapsing coastal corridor made the reconstruction of the Sanibel Causeway one of Florida’s most demanding infrastructure efforts in decades.
A central Texas utility plans a 7.2-mile transmission replacement to carry new groundwater supplies, pairing well expansion with modernization of a 60-year-old system.
Intuitive wayfinding, space-themed motifs and technology tools are components of the flight plan, with Hensel Phelps-led project set to finish in 2027.
Can municipal water and sewer systems absorb sudden high-occupancy detention conversions, or do peak-day margins and pipe limits dictate expansion first?