The 26 Best Project and Award of Merit winners in the latest incarnation of the annual competition impress judges on a variety of levels with teamwork as a common thread.
Overall Spending Expected to Rise 3%, About Half the Rate Posted Last Year. Sharp drop in residential will be more than offset by strength in public works and commercial activity.
The $12.1-million Val Vista Water Transmission Main Rehabilitation project was performed on more than 6,000 linear ft of pre-stressed concrete cylinder pipe that delivers water to more than 60% of the population in the city of Phoenix.
After the original rubber-bladder dam failed in 2010 and drained 1 billion gallons of water without warning from Tempe Town Lake, the city of Tempe, Ariz., engaged the construction team to design and build a more permanent replacement.
The $2.31-million Horse Mesa Dam Rock Debris Talus Stabilization project mitigates a rock-fall debris talus deposit located in extremely remote terrain at Salt River Project’s Horse Mesa Dam, east of Phoenix.