Block 162, a 606,000-sq-ft office building in downtown Denver, topped out this spring. When complete, the 30-story Class A office building will include 20 floors of office space on Levels 11-30. The facade is comprised of an all-glass curtain-wall system, offering views of the Front Range from every office floor through 10-ft-tall clear windows. The office building will feature an 11th floor amenity area complete with a fitness center, social lounge and conference and meeting space. The interior amenity spaces will provide direct access to the building’s sky terrace, also located on the 11th floor.
Construction of Block 162 is slated for completion in December, with tenant occupancy available as early as January 2021. The project is targeting LEED Gold certification. Patrinely Group is the developer; the architect is Gensler; and the contractor is Swinerton.