Alot can happen in 95 days. Charged with replacing the Glenwood Springs, Colo., Grand Avenue Bridge in that short, inflexible timeframe, the project team had to get everything right the first time.
The Colorado Dept. of Transportation said 95 days was the maximum time the resort community on Colorado’s Western Slope could be without its primary road between downtown and the famed hot springs, across the Colorado River to the north.