In 2006, the budget was reduced 35% without a reduction in programmed space, meaning the design was drastically over cost. After a re-bid, the new team conducted several design “interventions” to keep unique architectural features, such as the dramatic “canyon” that showcases the asymmetrical towers on each side of the public lobby, but at a reduced cost. The team also saved millions by working around a key fiber optics line and completely redesigning the mechanical system.