Submitted by Brignall Construction Co.
This facility serves the needs of Chandler’s most needy families with individual spaces providing medical services, eye examinations, full dental care, counseling and social services, food banks and a community room. Collaboration with the community was a key concept for the center, with the $2-million funding provided through public donations. Despite tough economic times, the entire team, from subcontractors to engineers, stepped up with significant donations of services, materials and labor.
Strategies to reach LEED silver included recycling 93% of construction waste, daylighting, use of recycled building materials and highly efficient HVAC system.
Owner: Chandler Unified School District
General Contractor: Brignall Construction Co.
Architect: BCDM
Engineers: GRAEF; Systems Design Eng.; Zell Co.; Associated Mechanical Engineers
Subcontractors: A-1 Fire Sprinklers; Bold Framing; Desert Sun Masonry; Code One Construction; Jonic Glass; L.R. Cowan Concrete; Phoenix Wall Systems; Skyce Steel; Source Refrigeration & HVAC; W.J. Maloney Plumbing; Western Elegance Painting; Wilson Electric