Design/Assist project that consists of nine stories, roughly 350,000 sq. ft., hospital tower, a central utility plant upgrade with a connecting tunnel between the CUP and the new hospital building and a parking garage. Notable project features include: 80 family-friendly private rooms, new emergency, imaging, and surgery departments, and overall reduction in water and energy use.
Name of Project: Good Samaritan Hospital Patient Care Tower Location: Puyallup, Wash. Owner: Good Sam/Multicare Health System Architect: Good Sam Design Collaborative General Contractor: Skanska USA Engineers or Other Design Consultants: CDi Engineers Subcontractor(s): University Mechanical Contractors, Inc., Mukilteo, Wash; DBM, Federal Way, Wash.; Veca Electric, Seattle. Total Construction Cost: $400 million Construction Start Date: August 2007 Expected Completion Date: December 2010