Project sites set ablaze in Minneapolis, D.C. and Ohio, as construction is shut down in downtown Chicago and in California; NYC sets first curfew in decades amid looting, even of boarded-up stores.
A $262 million project near Seattle’s Georgetown neighborhood will treat up to 70 million gallons of polluted stormwater that currently flows into the Duwamish River during severe rainstorms.