The Seattle Dept. of Transportation closed the bridge in March due to cracks. Kraemer North America was hired under an emergency contract to stabilize the structure. WSP provided the engineering.
Work on the nearly $100-million perimeter pile upgrade on the 645-ft-tall residential tower to prevent significant future settlement follows the resolution of litigation.
In a massive effort to revitalize 22 acres of downtown Long Beach, the city and the Port of Long Beach took an innovative path to meet the area’s ambitious development goals with the Long Beach Civic Center, ENR’s 2020 Project of the Year for Southern California.