As part of the nine-year, $1.62-billion Port of Long Beach Middle Harbor Redevelopment Program, Arcadis provided full construction management services under a five-year, $31-million contract for Phase 1.
The design-build team of Hensel Phelps and Fentress Architects delivered the first air traffic control tower to employ a performance-based seismic design with vertical post-tensioning.
Complex shoring and underpinning helped crews safely renovate the 1939 Art Deco-style University of California printing plant and build a 30,000-sq-ft addition encased in a sweeping metal skin.
The team solved a significant geotechnical challenge linking the 11-level art museum expansion to the existing five-story museum on a tight infill block in downtown San Francisco.
The Inland Empire’s transportation sector remains active, including several key tolling projects underway that will ease traffic congestion and improve safety, Khalil Saba says.
The University of Washington-Tacoma completed renovations on the historic McDonald-Smith Building, Washington’s dogged convention center project faces further delays, MIT study validates Seattle concrete association’s claims, and more.