After approving a 2019 building code that requires all new homes in the state to have rooftop solar panels starting in 2020, the California Energy Commission is now eyeing commercial buildings.
The 1.1-million-sq-ft First Solar Modular Manufacturing Plant planned for Lake Township, Ohio, will be the single largest thin-film solar module manufacturing facility in the U.S. when it’s completed in late 2019.
The Eugene Water & Electric Board has awarded WorleyParsons a $1-million EPC contract to install a 500-kW/1,000-kWh battery energy storage system at the Howard Elementary School in Eugene, Ore.
Saudi Arabia’s renewable energy procurement body has kicked off the nation’s solar energy program by sealing a privately financed contract with ACWA Power to develop a 300-MW plant.
Following an aggressive five-month schedule, Cianbro Corp. is putting the finishing touches on a 9.9-MW solar energy facility, which began producing power last month.
Tesla CEO Elon Musk made good on his vow to the state of South Australia, installing a 100-MW, 129-MWh lithium-ion battery system in less than 100 working days at a 315-MW wind farm north of Adelaide.