Earthquakes, wind and ice can make electric service transmission poles topple like dominoes, costing millions of dollars to replace.
Jon Rouse, a civil engineering professor at Iowa State University, hopes to eliminate that cost by incorporating hinges into the base of poles to deflect stress and bounce the poles back—like Weebles, the 1970s toys that “wobble but don’t fall down.”