Balfour Beatty, working as managing partner, led the BARC joint venture team with Azteca, H.J. Russell and CARCON in the $140-million, 400,000-sq-ft DFW International Airport Terminal A Phase II renovation and improvement project.
Shell Chemical announced Nov. 30 its final investment decision to increase alpha olefins production at its existing chemical manufacturing site in Geismar, La. As part of the plan, Shell will construct a fourth AO unit, adding 425,000 tonnes of capacity.
At the new headquarters of Porsche Cars North America Inc., the roar of jets from nearby Hartsfield-Jackson Atlanta International Airport competes with the purr of engines, as drivers try out some of the German-based auto manufacturer’s latest models on a 1.6-mile test track.
Located in the heart of the University of Miami’s Coral Gables campus, the Frost Music Studios project is part of a $61.5-million master plan that will nearly double the school’s space while preserving its historically significant architectural elements.
Contractors leading construction of the 94,000-sq-ft, three-story College Football Hall of Fame and Chick-Fil-A Fan Experience had to overcome an extremely tight site in downtown Atlanta bordered by Marietta Street, railroad tracks, the Omni Hotel and Baker Street.
Named for two FBI special agents killed during a 1986 shootout in Miami, the Benjamin P. Grogan and Jerry L. Dove Federal Building in Miramar, Fla., consists of a four-building campus situated on the edge of the Everglades.
Winder, Ga., revitalized its main downtown thoroughfare by combining the design and resources of a streetscape enhancement effort with those of a roadway maintenance project.