This $34.1-million project included a 55,000-sq-ft expansion for technical education and STEM education programs as well as a 41,500-sq-ft renovation in an effort to bolster Brighton High School’s capacity to provide life-changing programming for its students.
A four-month tenant improvement project converted a portion of Meow Wolf’s Denver exhibition Convergence Station into an immersive bar lounge that features just one 90-degree angle and an overall circular design with curvature walls and a ceiling-suspended stage crown.
A former department store has been transformed into a modern office space and laboratory for Biodesix, a life sciences company that develops tools to detect lung disease.
On the final 18-mile, four-lane stretch of I-25 between Denver and Colorado Springs, a $330-million project has added a tolled express lane in each direction, improved safety for the traveling public and added four wildlife underpasses, more than 28 miles of wildlife exclusion fence and widened shoulders.
Originally built in the 1940s, two pedestrian access bridges at the southern entrance of the iconic Red Rocks Amphitheater had reached the end of their service life.
First built as a production facility in 1978, the Discovery Center was in need of renovations to improve the visitor experience and to add new exhibit spaces.
A $124.45-million campus provides unified space for the Aurora Water Dept.’s 16 divisions, along with a targeted maintenance service location for the rapidly expanding southeast metro area.
Composed of a preengineered metal structure combined with conventional steel, this innovative 35,000-sq-ft facility doubles down on the School of Mines’ dedication to hands-on learning.