It may not mean much of anything for the future of Portland’s Memorial Coliseum, but the 1960-opened glass-encased arena has garnered the city’s first-ever designation as a National Treasure by the National Trust for Historic Preservation.
The planned Washington State Convention Center expansion—a $1.4 billion project in downtown Seattle—has a new contractor in place, even if it took firing the old one to get there.
Those ubiquitous yellow curve advisory speed signs pepper our highways, freeways and roadways. But often the speeds posted below the curving black arrow have old data behind them.
The Los Angeles Metropolitan Transit Authority extended its due date for design-build proposals from prequalified bidders to June 1 for the $1.4-billion Westside Purple Line Extension, Section 2 project.