A nearly 2,000-ft-long tunnel to carry light rail under downtown Bellevue is more than 90% complete, with an expected final break through to the site of the future Bellevue Downtown Station around July 20.
Sound Transit has teamed with developer Gerding Edlen to create a transit-oriented, mixed-income and mixed-use development to surround a new Capitol Hill light rail station in Seattle.
The Orange County Sanitation District has hired Black & Veatch to design the overhaul and upgrade of Wastewater Plant No. 2 in Huntington Beach, Calif.
As Everett continues to expand its waterfront, a design collaboration aims to conclude a decades-long effort to create pedestrian access to the waterfront from the upland Grand Avenue Park.
An additional 40 tons of structural steel is sitting on the Dept. of Energy Hanford Nuclear Waste Site in southeast Washington, where Bechtel National Inc. plans a new tower as part of the multi-billion-dollar Waste Treatment and Immobilization Plant.