South Wing of the St. Vrain Community Hub
Longmont, Colo.
Award of Merit


Owner Boulder County
Lead Design OZ Architecture
Civil Engineer JVA Inc.
Structural Engineer Structural Consultants Inc.
MEP Engineer The RMH Group Inc.
Landscape Design PCS Group Inc.
General Contractor Adolfson & Peterson Construction


The new South Wing of the St. Vrain Community Hub offers a wide range of services, including health coverage, food assistance, immunizations, job training, employment assistance and more. Boulder County wanted the project to exemplify a functional, sustainable building. The 75,000-sq-ft addition uses solar power and advanced technology to conserve energy and reduce water use. It features a 91.5-kW PV system, which will result in 48% energy-use savings and 43% energy-cost savings over the county’s previous location. It is on track to receive LEED Platinum certification. Other unique features include salvaged wood from a local church, a recycling and composting program, a regional demonstration garden and comprehensive transportation options.
 

Back to Mountain States Best Projects