Top Starts In the Southwest
 
Rank Project Location Project Cost Start Date/ End Date Owner Project team
1 Intel Fab 42 Semiconductor Manufacturing Facility Chandler, Ariz. $5 billion 2Q 2011/ 2013 Intel Corp. Design IDC ArchitectsGC Hoffman Construction Co.
2 Solana Solar Generating Station Plant Gila Bend, Ariz. $1.6 billion May 2011/2013 Abengoa Solar Inc./Arizona Solar One Design-Build Abener/Teyma Joint Venture
3 Crescent Dunes Solar Energy Project Nye County, Nev. $900 million Aug. 2011/Summer 2013 SolarReserve Design Pratt & Whitney RocketdyneGC Cobra Thermosolar Plants Inc.
4 One Nevada Transmission Line (ON Line) Ely, Nev. $510 million 1Q 2011/Early 2013 NV Energy Design Power Engineers Inc.GC Sturgeon Electric Co. (lines); Wilson Utility Construction
5 Patua Geothermal Power PlantFernley, Nev. $300 million Aug. 2011/Late 2012 Gradient Resources Design-Build SAIC Constructors
6 Spring Valley Wind Farm & Electrical Substation Ely, Nev. $250 million Aug. 2011/June 2012 Pattern Energy Group GC Mortenson Construction
7 First Solar Manufacturing Plant Mesa, Ariz. $200 million May 2011/3Q 2012 First Solar Inc. Design First Solar Inc.GC M+W Group
8 32 MGD Water Reclamation CampusTucson, Ariz. $172.3 million June 2011/May 2014 Pima County RWRD Design-Build-Operate CH2M HILL
9 I-10/SR 303L Traffic InterchangePhoenix, Ariz. $133.9 million Nov. 2011/May 2014 Ariz. Dept. of Transportation Design AZTEC EngineeringGC Pulice Construction
10 303L, Peoria Ave. to Mountain View Blvd.Surprise, Ariz. $128.7 million Aug. 2011/Oct. 2013 Ariz. Dept. of Transportation Design Premier Engineering; Ritoch-Powell & AssociatesGC Pulice Construction
11 Chandler Regional Medical Center Tower ExpansionChandler, Ariz. $125 million Dec. 2011/4Q 2014 Dignity Health Design Orcutt|WinslowGC Kitchell
12 Sky Harbor Airport SkyTrain Phase 1APhoenix, Ariz. $120 million Aug. 2011/May 2014 City of Phoenix Aviation Dept. Design Gannett Fleming Inc.GC McCarthy Bldg. Cos. Inc. & Kiewit Western Co. Joint Venture
13 Rte. 215 Bruce Woodbury Beltway, Tenaya Way to Decatur Blvd.Las Vegas, Nev. $116.8 million Oct. 2011/April 2014 Clark County Public Works Design G.C. WallaceGC Las Vegas Paving Corp.
14 Harmon CornerLas Vegas, Nev. $100 million May 2011/Dec. 2011 (shell only) BPS Partners Design SH ArchitectureGC PENTA Building Group
15 McCarran Air Traffic Control TowerLas Vegas, Nev. $99 million June 2011/Early 2015 Federal Aviation Admin. - Western Pacific Region Design WHPacificGC Archer Western Contractors
16 Twin Arrows Navajo Resort & CasinoFlagstaff, Ariz. $92 million Sept. 2011/Sept. 2012 Sicon Design Friedmutter GroupGC Hunt Construction Group
17 I-10 Widening, Ruthrauff to Prince Rd.Tucson, Ariz. $76.4 million Sept. 2011/Late 2013 Ariz. Dept. of Transportation Design AECOMGC Pulice Construction
18 I-80, Robb Dr. Interchange to Vista Blvd. InterchangeReno, Nev. $72 million May 2011/Dec. 2012 Nevada Dept. of Transportation GC Granite ConstructionDesign Atkins North America
19 I-17 Cordes JunctionPrescott, Ariz. $65.2 million Aug. 2011/ June 2013 Ariz. Dept. of Transportation Design HDR Inc.GC Sundt Construction Heavy Civil Division/Vastco (JV)
20 Northern Edge Navajo Nation Casino - Phase 1 Upper Fruitland, N.M. $60 million March 2011/Jan. 2012 Navajo Nation Gaming Enterprise GC Arviso/Okland Construction JV
21 University of Arizona North End Zone Stadium UpgradesTucson, Ariz. $56.9 million Dec. 2011/July 2013 University of Arizona Design Heery Intl.GC Mortenson ConstructionCivil/MEP M3 Engineering
22 Urban Outfitters West Coast E-Commerce Internet Fulfillment CenterReno, Nev. $50 million June 2011/June 2012 Urban Outfitters Design United Construction Co.GC United Construction Co.Developer Dermody Properties
23 Advanced Wastewater Treatment Membrane/Ozonation Facilities Phase 1Las Vegas, Nev. $49.9 million Feb. 2011/Feb. 2013 Clark County Water Reclamation District Design MWH AmericaGC McCarthy Building Cos.
24 Hilltop Townhomes & The Suites (NAU Residence Halls)Flagstaff, Ariz. $42 million July 2011/Aug. 2012 American Campus Communities Design Todd & AssociatesGC hardison/downey construction
25 Arizona State University McCord Hall at the W. P. Carey School of BusinessTempe, Ariz. $38.4 million Oct. 2011/July 2013 Arizona Board of Regents/ASU Design Kohn Pedersen Fox Associates; RSP ArchitectsGC DPR Construction Inc.