The modernization of Deer Park High School includes 81,000 sq ft of renovated space and 68,000 sq ft of new addition for a total of 149,000 sq ft in the completed project. Site design includes expanded parking for all users and a bus loop that surrounds the school and also provides access for emergency and delivery vehicles. Related Links: Northwest Construction Top Starts Key Players Project Name: Deer Park High School Location: Deer Park, Wash. Total Construction Cost: $34 million Construction Start Date: September 2008 Expected Completion Date: Fall 2010 Owner/Developer: Deer Park School District General Contractor: Garco Construction Design
Family Housing Replacement is a design/build fast track project located in the Denali Village area on Fort Wainwright, AK. Extensive site work has been required to deal with permafrost and unsuitable soil issues to make the site suitable for a subdivision consisting of 200 Units of Junior and Senior Non-Commissioned Officer Housing with all associated infrastructure. Five different housing types in 4-plex configurations are situated on curvilinear streets with direct buried water, sewer, electrical and glycol circulation systems. IMAGE COURTESY OF NEESER CONSTRUCTION Related Links: Northwest Construction Top Starts Key Players Project Name: Family Housing Replacement, Denali Village Location: Fort
Construction of two 2.8 million gallon steel egg-shaped digesters with an integral 18,500 SF digestion process facility. The facility includes biosolids process mixing systems, recirculation and heating systems, transfer systems, digester gas and foam collection systems, and a stormwater and process overflow pump station. The facility also includes extensive building ventilation and heating systems, as well as associated process and instrumentation control systems. The work also required demolition of the existing Boiler/Cogeneration Facility and demolition of an existing post tensioned 2.1 million gallon concrete digester.. IMAGE COURTESY OF GARCO CONSTRUCTION Related Links: Northwest Construction Top Starts Key Players Project Name:
Design/Assist project that consists of nine stories, roughly 350,000 sq. ft., hospital tower, a central utility plant upgrade with a connecting tunnel between the CUP and the new hospital building and a parking garage. Notable project features include: 80 family-friendly private rooms, new emergency, imaging, and surgery departments, and overall reduction in water and energy use. IMAGE COURTESY OF UNIVERSITY MECHANICAL Related Links: Northwest Construction Top Starts Key Players Name of Project: Good Samaritan Hospital Patient Care Tower Location: Puyallup, Wash. Owner: Good Sam/Multicare Health System Architect: Good Sam Design Collaborative General Contractor: Skanska USA Engineers or Other Design Consultants: