Berklee College of Music Mixed-Use Project, Boston
Besides the typical challenges that a worksite located in a dense urban area can pose—little space for staging, heavy foot and vehicle traffic and a challenging schedule—the team building this 176,000-sq-ft, $76.6-million, mixed-use structure encountered a few more.