<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0" xmlns:media="http://search.yahoo.com/mrss/" xmlns:content="http://purl.org/rss/1.0/modules/content/">
  <channel>
    <title>Water &amp; Dams</title>
    <description>Image courtesy of: KE ZHUANG (iStock / Getty Images Plus) This section covers issues and content related to groundwater, canals, aqueducts and sewers and related construction.</description>
    <link>https://www.enr.com/rss/131</link>
    <language>en-us</language>
    <item>
      <title>Water Resources Bills Advance in House and Senate</title>
      <author>mcfarlandp@enr.com (Pam McFarland)</author>
      <description>Provisions include increased spending for drinking water infrastructure and streamlining U.S. Army Corps of Engineers' processes.</description>
      <content:encoded>
        <![CDATA[<p>Provisions include increased spending for drinking water infrastructure and streamlining U.S. Army Corps of Engineers' processes.&nbsp;</p>]]>
      </content:encoded>
      <guid>http://www.enr.com/articles/63323</guid>
      <pubDate>Wed, 15 Jul 2026 17:59:08 -0400</pubDate>
      <link>https://www.enr.com/articles/63323-water-resources-bills-advance-in-house-and-senate</link>
      <enclosure url="https://www.enr.com/ext/resources/2026/07/15/NYCHarborCorps.webp?t=1784196149" type="image/jpeg" length="175889"/>
    </item>
    <item>
      <title>Tunnel Boring Machine Prepared for $360M NH Stormwater Tunnel</title>
      <description>Granite Janet, a 281-ton tunnel boring machine, arrived on an oversized truck at a parking lot beside the Queen City Bridge in Manchester, N.H. late last month as the $360 million Cemetery Brook Drain Tunnel project team prepares for its launch in August.</description>
      <content:encoded>
        <![CDATA[<p>Granite Janet, a 281-ton tunnel boring machine, arrived on an oversized truck at a parking lot beside the Queen City Bridge in Manchester, N.H. late last month as the $360 million Cemetery Brook Drain Tunnel project team prepares for its launch in August.</p>]]>
      </content:encoded>
      <guid>http://www.enr.com/articles/63316</guid>
      <pubDate>Tue, 14 Jul 2026 13:00:00 -0400</pubDate>
      <link>https://www.enr.com/articles/63316-tunnel-boring-machine-prepared-for-360m-nh-stormwater-tunnel</link>
      <enclosure url="https://www.enr.com/ext/resources/Issues/National_Issues/2026/06-July/TC_01600_ENRwebready.webp?t=1784384502" type="image/jpeg" length="211057"/>
    </item>
    <item>
      <title>FlatironDragados-Led Team Tapped for Vancouver Port's Roberts Bank Terminal 2 Expansion</title>
      <author>gottliebb@enr.com (Bryan Gottlieb)</author>
      <description>Vancouver's future container terminal moves toward construction as planning begins for massive marine works and environmental mitigation before 2028 reclamation starts.</description>
      <content:encoded>
        <![CDATA[<p>Vancouver's future container terminal moves toward construction as planning begins for massive marine works and environmental mitigation before 2028 reclamation starts.</p>]]>
      </content:encoded>
      <guid>http://www.enr.com/articles/63312</guid>
      <pubDate>Tue, 14 Jul 2026 12:34:27 -0400</pubDate>
      <link>https://www.enr.com/articles/63312-flatirondragados-led-team-tapped-for-vancouver-ports-roberts-bank-terminal-2-expansion</link>
      <enclosure url="https://www.enr.com/ext/resources/2026/07/14/Vancouver-Port-Expansion.webp?t=1784046889" type="image/jpeg" length="145054"/>
    </item>
    <item>
      <title>Keystone Successor Firm Pays $70M to Settle Giant 2022 Kansas Pipe Spill</title>
      <author>rubind@enr.com (Debra K. Rubin)</author>
      <description>Federal consent decree comes as new Canadian owner South Bow gains US permission for a line extension in the Midwest.</description>
      <content:encoded>
        <![CDATA[<p>Federal consent decree comes as new Canadian owner South Bow gains US permission for a line extension in the Midwest.</p>]]>
      </content:encoded>
      <guid>http://www.enr.com/articles/63311</guid>
      <pubDate>Tue, 14 Jul 2026 10:26:25 -0400</pubDate>
      <link>https://www.enr.com/articles/63311-keystone-successor-firm-pays-70m-to-settle-giant-2022-kansas-pipe-spill</link>
      <enclosure url="https://www.enr.com/ext/resources/2026/07/13/keystoneOILSPEILL.2022.EPA.webp?t=1784384503" type="image/jpeg" length="234677"/>
    </item>
    <item>
      <title>Queensland Utility Awards $165M Stage 1 Contract for Toowoomba-Warwick Pipeline</title>
      <author>gottliebb@enr.com (Bryan Gottlieb)</author>
      <description>A first contract award moves northeast Australian water pipeline closer to construction, with challenging geology and trenchless crossings still ahead.</description>
      <content:encoded>
        <![CDATA[<p>A first contract award moves northeast Australian water pipeline closer to construction, with challenging geology and trenchless crossings still ahead.</p>]]>
      </content:encoded>
      <guid>http://www.enr.com/articles/63298</guid>
      <pubDate>Thu, 09 Jul 2026 13:05:46 -0400</pubDate>
      <link>https://www.enr.com/articles/63298-queensland-utility-awards-165m-stage-1-contract-for-toowoomba-warwick-pipeline</link>
      <enclosure url="https://www.enr.com/ext/resources/2026/07/09/Leslie-Dam.webp?t=1783678602" type="image/jpeg" length="192534"/>
    </item>
    <item>
      <title>A Newer Sewer Threads Past Hills, Highways and Houses in Portland, Ore.</title>
      <author>choa@enr.com (Aileen Cho)</author>
      <description>Steep slopes, narrow streets, a busy interstate highway—and two abandoned trestles—are some of the challenges faced by the Carolina Trunk Rehabilitation project team.</description>
      <content:encoded>
        <![CDATA[<p>Steep slopes, narrow streets, a busy interstate highway—and two abandoned trestles—are some of the challenges faced by the Carolina Trunk Rehabilitation project team.</p>]]>
      </content:encoded>
      <guid>http://www.enr.com/articles/63258</guid>
      <pubDate>Thu, 02 Jul 2026 15:00:00 -0400</pubDate>
      <link>https://www.enr.com/articles/63258-a-newer-sewer-threads-past-hills-highways-and-houses-in-portland-ore</link>
      <enclosure url="https://www.enr.com/ext/resources/Issues/National_Issues/2026/06-July/ENR-0706-Stumptown-Sewer-1440px.webp?t=1783045724" type="image/jpeg" length="385059"/>
    </item>
    <item>
      <title>Ongoing Effort to Rehabilitate Portland's Aging Sewer System</title>
      <author>blairs@enr.com (Scott Blair)</author>
      <description>To repair and replace its aging sewer system, the City of Portland Bureau of Environmental Services has several programs running concurrently, including a small-diameter program, a bespoke Downtown–Old Town program and the large-diameter program.</description>
      <content:encoded>
        <![CDATA[To repair and replace its aging sewer system, the City of Portland Bureau of Environmental Services has several programs running concurrently, including a small-diameter program, a bespoke Downtown–Old Town program and the large-diameter program.]]>
      </content:encoded>
      <guid>http://www.enr.com/articles/63261</guid>
      <pubDate>Thu, 02 Jul 2026 00:00:00 -0400</pubDate>
      <link>https://www.enr.com/articles/63261-ongoing-effort-to-rehabilitate-portlands-aging-sewer-system</link>
      <enclosure url="https://www.enr.com/ext/resources/Issues/National_Issues/2026/06-July/ENR-0706-Portland-Sewers.webp?t=1783045725" type="image/jpeg" length="122788"/>
    </item>
    <item>
      <title>Mass. Beaches Reopen for Swimming After Massive Sewer Main Break North of Boston </title>
      <description>A massive water main break spewed sewage into a Massachusetts river, temporarily closing local beaches.</description>
      <content:encoded>
        <![CDATA[<p>A massive water main break spewed sewage into a Massachusetts river, temporarily closing local beaches.</p>]]>
      </content:encoded>
      <guid>http://www.enr.com/articles/63253</guid>
      <pubDate>Wed, 01 Jul 2026 11:14:11 -0400</pubDate>
      <link>https://www.enr.com/articles/63253-mass-beaches-reopen-for-swimming-after-massive-sewer-main-break-north-of-boston</link>
      <enclosure url="https://www.enr.com/ext/resources/2026/WEB-Haverhill-pipeline-photo-1-copy.webp?t=1782918827" type="image/jpeg" length="71841"/>
    </item>
    <item>
      <title>PFAS, Project Funding Are Key Woes as Drinking Water Providers Convene</title>
      <author>mcfarlandp@enr.com (Pam McFarland)</author>
      <description>Utilities and industry grappled with multiple demands, from 'forever chemical' remediation to funding shortfalls, at American Water Works Association annual meetingheld June 22-24</description>
      <content:encoded>
        <![CDATA[<p>Utilities and industry grappled with multiple demands, from 'forever chemical' remediation to funding shortfalls, at American Water Works Association annual meetingheld June 22-24</p>]]>
      </content:encoded>
      <guid>http://www.enr.com/articles/63249</guid>
      <pubDate>Tue, 30 Jun 2026 19:05:04 -0400</pubDate>
      <link>https://www.enr.com/articles/63249-pfas-project-funding-are-key-woes-as-drinking-water-providers-convene</link>
      <enclosure url="https://www.enr.com/ext/resources/2026/06/30/06302026_Executive_Summary_Chart_ENRwebready.webp?t=1783045727" type="image/jpeg" length="74575"/>
    </item>
    <item>
      <title>Walsh-Soletanche JV Advances $669M Delaware Container Terminal</title>
      <author>gottliebb@enr.com (Bryan Gottlieb)</author>
      <description>The project is intended to quadruple the port's container capacity, accommodate larger container vessels and meet growing international cargo demand.</description>
      <content:encoded>
        <![CDATA[<p><span style=" font-style: normal; font-weight: 400; letter-spacing: normal; orphans: 2; text-align: left; widows: 2; word-spacing: 0px; display: inline !important; float: none;">The project is intended to quadruple the port's container capacity, accommodate larger container vessels and meet growing international cargo demand.</span></p><br>]]>
      </content:encoded>
      <guid>http://www.enr.com/articles/63239</guid>
      <pubDate>Mon, 29 Jun 2026 15:12:48 -0400</pubDate>
      <link>https://www.enr.com/articles/63239-walsh-soletanche-jv-advances-669m-delaware-container-terminal</link>
      <enclosure url="https://www.enr.com/ext/resources/2026/06/29/Delaware-Port-2.webp?t=1782817009" type="image/jpeg" length="239413"/>
    </item>
    <item>
      <title>Q&amp;A: Panama Canal’s First Woman Administrator Looks Ahead</title>
      <description>The Panama Canal’s first female administrator, Ilya Espino de Marotta, talks leadership, engineering and equity.</description>
      <content:encoded>
        <![CDATA[<p>The Panama Canal’s first female administrator, Ilya Espino de Marotta, talks leadership, engineering and equity.</p>]]>
      </content:encoded>
      <guid>http://www.enr.com/articles/63207</guid>
      <pubDate>Wed, 24 Jun 2026 07:07:53 -0400</pubDate>
      <link>https://www.enr.com/articles/63207-q-and-a-panama-canals-first-woman-administrator-looks-ahead</link>
      <enclosure url="https://www.enr.com/ext/resources/2026/06/22/Ilya_ENRwebready.webp?t=1782245550" type="image/jpeg" length="207266"/>
    </item>
    <item>
      <title>New Panama Canal Chief Takes on Next Wave of Megaprojects </title>
      <description>The Panama Canal is about to undertake an $8.5-billion-plus capital improvement plan aimed at creating a Trans-Isthmus Logistics Corridor.</description>
      <content:encoded>
        <![CDATA[<p>The Panama Canal is about to undertake an $8.5-billion-plus capital improvement plan aimed at creating a Trans-Isthmus Logistics Corridor.</p>]]>
      </content:encoded>
      <guid>http://www.enr.com/articles/63214</guid>
      <pubDate>Wed, 24 Jun 2026 07:07:37 -0400</pubDate>
      <link>https://www.enr.com/articles/63214-new-panama-canal-chief-takes-on-next-wave-of-megaprojects</link>
      <enclosure url="https://www.enr.com/ext/resources/2026/06/23/0626_PanamaCanal_HeroImage_ENRwebready.webp?t=1782386027" type="image/jpeg" length="203333"/>
    </item>
    <item>
      <title>Water Conservation Meets Geopolitics at the Panama Canal</title>
      <description>The Panama Canal is bracing for renewed drought risk while surging traffic from Strait of Hormuz disruptions tests water-saving measures and long-term reservoir plans.</description>
      <content:encoded>
        <![CDATA[<p>The Panama Canal is bracing for renewed drought risk while surging traffic from Strait of Hormuz disruptions tests water-saving measures and long-term reservoir plans.
</p>]]>
      </content:encoded>
      <guid>http://www.enr.com/articles/63209</guid>
      <pubDate>Wed, 24 Jun 2026 07:00:00 -0400</pubDate>
      <link>https://www.enr.com/articles/63209-water-conservation-meets-geopolitics-at-the-panama-canal</link>
      <enclosure url="https://www.enr.com/ext/resources/2026/06/22/Ship4_LNG_ENRwebready.webp?t=1782567445" type="image/jpeg" length="204111"/>
    </item>
    <item>
      <title>Project Cost, Risk Responsibility Debated at Resilience Conference</title>
      <description>Speakers at New York City event last month discussed need for communities to be better prepared for drastic changes in water levels.</description>
      <content:encoded>
        <![CDATA[<p><span style=" font-style: normal; font-weight: 400; letter-spacing: normal; orphans: 2; text-align: left; widows: 2; word-spacing: 0px; display: inline !important; float: none;">Speakers at New York City event last month discussed need for communities to be better prepared for drastic changes in water levels.</span></p>]]>
      </content:encoded>
      <guid>http://www.enr.com/articles/63200</guid>
      <pubDate>Fri, 19 Jun 2026 11:54:52 -0400</pubDate>
      <link>https://www.enr.com/articles/63200-project-cost-risk-responsibility-debated-at-resilience-conference</link>
      <enclosure url="https://www.enr.com/ext/resources/2026/06/19/WebWaterAllianceConf.webp?t=1781891221" type="image/jpeg" length="66709"/>
    </item>
    <item>
      <title>Navy Maps Out Four Packages for Planned $10B Bremerton Dry Dock Rebuild</title>
      <author>gottliebb@enr.com (Bryan Gottlieb)</author>
      <description>As the U.S. Navy advances a planned $10-billion dry dock at Puget Sound Naval Shipyard, new documents reveal four major construction packages and phasing.</description>
      <content:encoded>
        <![CDATA[<p>As the U.S. Navy advances a planned $10-billion dry dock at Puget Sound Naval Shipyard, new documents reveal four major construction packages and phasing.</p>]]>
      </content:encoded>
      <guid>http://www.enr.com/articles/63176</guid>
      <pubDate>Tue, 16 Jun 2026 14:11:28 -0400</pubDate>
      <link>https://www.enr.com/articles/63176-navy-maps-out-four-packages-for-planned-10b-bremerton-dry-dock-rebuild</link>
      <enclosure url="https://www.enr.com/ext/resources/2026/06/16/Bremerton-Dry-Dick-4.webp?t=1781696335" type="image/jpeg" length="224567"/>
    </item>
    <item>
      <title>EPA Approves 13-Acre PCB Landfill in Western Massachusetts</title>
      <description>General Electric is building a 13-acre landfill in Lee, Mass.</description>
      <content:encoded>
        <![CDATA[<p><span style=" font-style: normal; font-weight: 400; letter-spacing: normal; orphans: 2; text-align: center; widows: 2; word-spacing: 0px; display: inline !important; float: none;">General Electric is building a 13-acre landfill in Lee, Mass.</span></p>]]>
      </content:encoded>
      <guid>http://www.enr.com/articles/63169</guid>
      <pubDate>Mon, 15 Jun 2026 14:54:57 -0400</pubDate>
      <link>https://www.enr.com/articles/63169-epa-approves-13-acre-pcb-landfill-in-western-massachusetts</link>
      <enclosure url="https://www.enr.com/ext/resources/2026/06/12/UDF-Cover-Graphic.webp?t=1781360850" type="image/jpeg" length="217420"/>
    </item>
    <item>
      <title>Tapping Into Torrance’s Brackish Water Plume</title>
      <description>Unlocking a long inaccessible source of groundwater through a combination of progressive design-build delivery and pilot-driven decision-making.</description>
      <content:encoded>
        <![CDATA[<p>Unlocking a long inaccessible source of groundwater through a combination of progressive design-build delivery and pilot-driven decision-making.</p>]]>
      </content:encoded>
      <guid>http://www.enr.com/articles/63161</guid>
      <pubDate>Mon, 15 Jun 2026 12:00:00 -0400</pubDate>
      <link>https://www.enr.com/articles/63161-tapping-into-torrances-brackish-water-plume</link>
      <enclosure url="https://www.enr.com/ext/resources/Issues/West/2026/June/West-DigTorrance-June2026-4.webp?t=1781296422" type="image/jpeg" length="131206"/>
    </item>
    <item>
      <title>$400M, 30-Mile Illinois Water Pipeline Moves Forward </title>
      <author>manniona@enr.com (Annemarie Mannion)</author>
      <description>Pipeline to bring Lake Michigan water to Chicago's far-west suburbs passes critical milestone.</description>
      <content:encoded>
        <![CDATA[<p>Pipeline to bring Lake Michigan water to Chicago's far-west suburbs passes critical milestone.</p>]]>
      </content:encoded>
      <guid>http://www.enr.com/articles/63157</guid>
      <pubDate>Fri, 12 Jun 2026 15:53:34 -0400</pubDate>
      <link>https://www.enr.com/articles/63157-400m-30-mile-illinois-water-pipeline-moves-forward</link>
      <enclosure url="https://www.enr.com/ext/resources/2026/06/14/Ill.-Water-Pipeline-2.webp?t=1781523932" type="image/jpeg" length="238258"/>
    </item>
    <item>
      <title>GE Gets Underway on 13-Acre PCB Landfill in Western Massachusetts</title>
      <description>The planned landfill will contain 3 million cu yd of polychlorinated biphenyl-containing sediment from the Housatonic River contaminated from last-century transformer manufacturing</description>
      <content:encoded>
        <![CDATA[The planned landfill will contain 3 million cu yd of polychlorinated biphenyl-containing sediment from the Housatonic River contaminated from last-century transformer manufacturing]]>
      </content:encoded>
      <guid>http://www.enr.com/articles/63158</guid>
      <pubDate>Fri, 12 Jun 2026 14:00:00 -0400</pubDate>
      <link>https://www.enr.com/articles/63158-ge-plans-summer-start-for-13-acre-pcb-landfill-in-western-massachusetts</link>
      <enclosure url="https://www.enr.com/ext/resources/2026/06/12/UDF-Cover-Graphic.webp?t=1781360850" type="image/jpeg" length="217420"/>
    </item>
    <item>
      <title>Virginia Beach Begins Initial Phase of $518M Flood Protection Program</title>
      <description>The Windsor Woods program totals $518 million for flood control efforts in Virginia Beach, Va.</description>
      <content:encoded>
        <![CDATA[<p><span style=" font-style: normal; font-weight: 400; letter-spacing: normal; orphans: 2; text-align: left; widows: 2; word-spacing: 0px; display: inline !important; float: none;">The Windsor Woods program totals $518 million for flood control efforts in Virginia Beach, Va.</span></p><p><span style=" font-style: normal; font-weight: 400; letter-spacing: normal; orphans: 2; text-align: left; widows: 2; word-spacing: 0px; display: inline !important; float: none;"> </span></p>]]>
      </content:encoded>
      <guid>http://www.enr.com/articles/63154</guid>
      <pubDate>Thu, 11 Jun 2026 16:41:45 -0400</pubDate>
      <link>https://www.enr.com/articles/63154-va-beach-begins-initial-phase-of-518m-flood-protection-program</link>
      <enclosure url="https://www.enr.com/ext/resources/2026/WEB-Windsor-Woods-tide-gate-with-closed-gates.webp?t=1781209807" type="image/jpeg" length="72904"/>
    </item>
    <item>
      <title>UAE Awards $285M EPC Contract for Desalination Plant P3 Project</title>
      <description>The seawater reverse osmosis desalination plant will be located at the Port of Fujairah, the second such facility delivered under a public-private partnership model in the United Arab Emirates.</description>
      <content:encoded>
        <![CDATA[<p>The <span style=" font-style: normal; font-weight: 400; letter-spacing: normal; orphans: 2; text-align: left; widows: 2; word-spacing: 0px; display: inline !important; float: none;">seawater reverse osmosis&nbsp;</span>desalination plant will be located at the Port of Fujairah, the second such facility delivered under a public-private partnership model in the United Arab Emirates.</p>]]>
      </content:encoded>
      <guid>http://www.enr.com/articles/63152</guid>
      <pubDate>Thu, 11 Jun 2026 14:24:08 -0400</pubDate>
      <link>https://www.enr.com/articles/63152-uae-awards-285m-epc-contract-for-desalination-plant-p3-project</link>
      <enclosure url="https://www.enr.com/ext/resources/2026/06/11/UAEdesalinationsigning.webp?t=1781207163" type="image/jpeg" length="128337"/>
    </item>
    <item>
      <title>Colorado River Agencies Test Framework for Interstate Water Exchanges</title>
      <author>gottliebb@enr.com (Bryan Gottlieb)</author>
      <description>Can Southwest water agencies create a new market for desalinated and recycled water without building pipelines or altering Colorado River water rights?</description>
      <content:encoded>
        <![CDATA[<p>Can Southwest water agencies create a new market for desalinated and recycled water without building pipelines or altering Colorado River water rights?</p>]]>
      </content:encoded>
      <guid>http://www.enr.com/articles/63117</guid>
      <pubDate>Fri, 05 Jun 2026 16:39:00 -0400</pubDate>
      <link>https://www.enr.com/articles/63117-colorado-river-agencies-test-framework-for-interstate-water-exchanges</link>
      <enclosure url="https://www.enr.com/ext/resources/2026/06/05/Reclamation.webp?t=1780922254" type="image/jpeg" length="245490"/>
    </item>
    <item>
      <title>Pittsburgh Readies to Dig Into $1B Sewer Overflow Tunnel Project  </title>
      <description>Lane/Brayman’s five-year, $1-billion contract for the Ohio River Tunnel project in Pittsburgh is scheduled to get underway later this year.</description>
      <content:encoded>
        <![CDATA[<p>Lane/Brayman’s five-year, $1-billion contract for the Ohio River Tunnel project in Pittsburgh is s<span style=" font-style: normal; font-weight: 400; letter-spacing: normal; orphans: 2; text-align: left; widows: 2; word-spacing: 0px; display: inline !important; float: none;">cheduled to get underway later this year.</span></p>]]>
      </content:encoded>
      <guid>http://www.enr.com/articles/63109</guid>
      <pubDate>Thu, 04 Jun 2026 16:08:36 -0400</pubDate>
      <link>https://www.enr.com/articles/63109-pittsburgh-readies-to-dig-into-1b-sewer-overflow-tunnel-project</link>
      <enclosure url="https://www.enr.com/ext/resources/2026/WEB-Ohio-River-Tunnel-Map.webp?t=1780775003" type="image/jpeg" length="71080"/>
    </item>
    <item>
      <title>California Water Agency Ramps Up Novel Deep-Sea Desalination Plan</title>
      <author>rubind@enr.com (Debra K. Rubin)</author>
      <description>Las Virgenes Municipal Water District this fall will suspend ''pod' at depth in Santa Monica Bay to produce desalinated water using developer OceanWell's innovative technology, with less energy needed and less brine created.</description>
      <content:encoded>
        <![CDATA[<p>Las Virgenes Municipal Water District this fall will suspend ''pod' at depth in Santa Monica Bay to produce desalinated water using developer OceanWell's innovative technology, with less energy needed and less brine created.</p>]]>
      </content:encoded>
      <guid>http://www.enr.com/articles/63104</guid>
      <pubDate>Thu, 04 Jun 2026 15:43:00 -0400</pubDate>
      <link>https://www.enr.com/articles/63104-california-water-agency-ramps-up-novel-deep-sea-desalination-plan</link>
      <enclosure url="https://www.enr.com/ext/resources/2026/06/04/OceanWellpicLasVirgenesPod.webp?t=1780578998" type="image/jpeg" length="224079"/>
    </item>
    <item>
      <title>Southern California Water Agencies Mount Massive Push for Reuse</title>
      <author>mcfarlandp@enr.com (Pam McFarland)</author>
      <description>Separate programs work collectively to reduce reliance on imported supply, including effort to manufacture water through innovative deep-ocean desalination.</description>
      <content:encoded>
        <![CDATA[<p>Separate programs work collectively to reduce reliance on imported supply, including effort to manufacture water through innovative deep-ocean desalination.</p>]]>
      </content:encoded>
      <guid>http://www.enr.com/articles/63094</guid>
      <pubDate>Wed, 03 Jun 2026 16:10:00 -0400</pubDate>
      <link>https://www.enr.com/articles/63094-southern-california-water-agencies-mount-massive-push-for-reuse</link>
      <enclosure url="https://www.enr.com/ext/resources/Issues/National_Issues/2026/08-June/DSCN1218_ENRready.webp?t=1780775003" type="image/jpeg" length="449368"/>
    </item>
    <item>
      <title>US Commission Asks Mexico to Prioritize Pipes Leaking Raw Sewage in Tijuana River Valley</title>
      <author>yodersj@enr.com (Jeff Yoders)</author>
      <description>The parallel gravity line pipe system in the Tijuna River Valley ruptured twice in a period of less than two weeks.</description>
      <content:encoded>
        <![CDATA[<p>The parallel gravity line pipe system in the Tijuna River Valley ruptured twice in a period of less than two weeks.</p>]]>
      </content:encoded>
      <guid>http://www.enr.com/articles/63086</guid>
      <pubDate>Tue, 02 Jun 2026 10:54:41 -0400</pubDate>
      <link>https://www.enr.com/articles/63086-us-commission-asks-mexico-to-prioritize-pipes-leaking-raw-sewage-in-tijuana-river-valley</link>
      <enclosure url="https://www.enr.com/ext/resources/2026/06/02/Parallel-Gravity-Line-repair.webp?t=1780772085" type="image/jpeg" length="746071"/>
    </item>
    <item>
      <title>Port of Long Beach Continues $2.4B Buildout as Bigger Ships Come In </title>
      <author>choa@enr.com (Aileen Cho)</author>
      <description>Joint venture team is coping with tides, port traffic and unexploded ordnances on Port of Long Beach's $400-million pier infill project.</description>
      <content:encoded>
        <![CDATA[<p>Joint venture team is coping with tides, port traffic and unexploded ordnances on <span style=" font-style: normal; font-weight: 400; letter-spacing: normal; orphans: 2; text-align: left; widows: 2; word-spacing: 0px; display: inline !important; float: none;">Port of Long Beach's</span>&nbsp;$400-million pier infill project.</p>]]>
      </content:encoded>
      <guid>http://www.enr.com/articles/63064</guid>
      <pubDate>Fri, 29 May 2026 13:41:50 -0400</pubDate>
      <link>https://www.enr.com/articles/63064-port-of-long-beach-continues-24b-buildout-as-the-bigger-ships-come-in</link>
      <enclosure url="https://www.enr.com/ext/resources/2026/05/31/Port-of-Long-Beach-(2).webp?t=1780318558" type="image/jpeg" length="154795"/>
    </item>
    <item>
      <title>DC Agency Chief Defends Pre-Sewage Spill Maintenance, But System Repair Is Far from Over</title>
      <description>DC Water CEO David Gadis cited long-term access easements, standardized permitting timelines and better regulator field coordination "to prevent a recurrence of the failure," but one stakeholder lamented there was no conclusive spill cause or 'clear plan' to avoid future ones.</description>
      <content:encoded>
        <![CDATA[<p>DC Water CEO David Gadis cited long-term access easements, standardized permitting timelines and better regulator field coordination "to prevent a recurrence of the failure," but one stakeholder lamented there was no conclusive spill cause or 'clear plan' to avoid future ones.</p>]]>
      </content:encoded>
      <guid>http://www.enr.com/articles/63049</guid>
      <pubDate>Fri, 22 May 2026 15:50:00 -0400</pubDate>
      <link>https://www.enr.com/articles/63049-dc-agency-chief-defends-pre-sewage-spill-maintenance-but-system-repair-is-far-from-over</link>
      <enclosure url="https://www.enr.com/ext/resources/2026/05/22/House-hearing-Gadis-Testimony-052026_0.webp?t=1780171334" type="image/jpeg" length="160253"/>
    </item>
    <item>
      <title>EPA Scales Back Limits on PFAS Chemicals in Drinking Water</title>
      <author>mcfarlandp@enr.com (Pam McFarland)</author>
      <description>US Environmental Protection Agency wants to maintain legally enforceable limits on the most-studied types of "forever" chemicals known as PFAS but would roll back standards established for four other types, including GenX.</description>
      <content:encoded>
        <![CDATA[<p>US Environmental Protection Agency wants to maintain legally enforceable limits on the most-studied types of "forever" chemicals known as PFAS but would roll back standards established for four other types, including GenX.&nbsp;</p>]]>
      </content:encoded>
      <guid>http://www.enr.com/articles/63045</guid>
      <pubDate>Fri, 22 May 2026 12:46:51 -0400</pubDate>
      <link>https://www.enr.com/articles/63045-epa-scales-back-limits-on-pfas-chemicals-in-drinking-water</link>
      <enclosure url="https://www.enr.com/ext/resources/2026/05/22/EPA-headquartersEPA.webp?t=1779903555" type="image/jpeg" length="214147"/>
    </item>
    <item>
      <title>Army Corps Terminates Shimmick From Chickamauga Dam Lock Chamber Contract</title>
      <author>kormanr@enr.com (Richard Korman)</author>
      <description>Shimmick disputes the causes for termination from the $309-million project.</description>
      <content:encoded>
        <![CDATA[<p>Shimmick disputes the causes for termination from the $309-million project.</p>]]>
      </content:encoded>
      <guid>http://www.enr.com/articles/63043</guid>
      <pubDate>Fri, 22 May 2026 10:55:17 -0400</pubDate>
      <link>https://www.enr.com/articles/63043-army-corps-terminates-shimmick-from-chickamauga-dam-lock-chamber-contract</link>
      <enclosure url="https://www.enr.com/ext/resources/2026/05/22/Chickamauga-Dam-lock-replacement-project.webp?t=1779903554" type="image/jpeg" length="293206"/>
    </item>
  </channel>
</rss>
