<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0" xmlns:media="http://search.yahoo.com/mrss/" xmlns:content="http://purl.org/rss/1.0/modules/content/">
  <channel>
    <title>Buildings</title>
    <description>Image courtesy of: Gerville (iStock / Getty Images Plus) This section covers the design, construction, sustainability and performance of various types of buildings such as hotels, offices, retail, commercial, institutional and others.</description>
    <link>https://www.enr.com/rss/114</link>
    <language>en-us</language>
    <item>
      <title>How Engineers Will Determine Why NYC's Pfizer HQ Conversion Buckled</title>
      <author>gottliebb@enr.com (Bryan Gottlieb)</author>
      <description>After the NYC Pfizer building conversion buckled, what happens next? Leading experts in their fields map out what a complex structural failure examination looks like.</description>
      <content:encoded>
        <![CDATA[<p>After the NYC Pfizer building conversion buckled, what happens next? Leading experts in their fields map out what a complex structural failure examination looks like.</p>]]>
      </content:encoded>
      <guid>http://www.enr.com/articles/63296</guid>
      <pubDate>Wed, 08 Jul 2026 17:42:32 -0400</pubDate>
      <link>https://www.enr.com/articles/63296-how-engineers-will-determine-why-nycs-pfizer-hq-conversion-buckled</link>
      <enclosure url="https://www.enr.com/ext/resources/2026/07/08/Pfizer_Worker_ENRwebready.webp?t=1783592416" type="image/jpeg" length="213533"/>
    </item>
    <item>
      <title>Buckled Columns Leave NYC Pfizer HQ Conversion Unstable</title>
      <author>gottliebb@enr.com (Bryan Gottlieb)</author>
      <description>Why did two load-bearing columns buckle inside a landmark adaptive reuse project? Engineers must stabilize the building before seeking answers.</description>
      <content:encoded>
        <![CDATA[<p>Why did two load-bearing columns buckle inside a landmark adaptive reuse project? Engineers must stabilize the building before seeking answers.</p>]]>
      </content:encoded>
      <guid>http://www.enr.com/articles/63288</guid>
      <pubDate>Tue, 07 Jul 2026 16:22:38 -0400</pubDate>
      <link>https://www.enr.com/articles/63288-buckled-columns-leave-nyc-pfizer-hq-conversion-unstable</link>
      <enclosure url="https://www.enr.com/ext/resources/2026/07/08/Pfizer_Exterior_ENRwebready.webp?t=1783574740" type="image/jpeg" length="206755"/>
    </item>
    <item>
      <title>Aecon Wins $1.2B EPC Contract for Alberta Gas-Fired Power Plant</title>
      <author>gottliebb@enr.com (Bryan Gottlieb)</author>
      <description>Aecon $1.2B EPC award launches construction of Alberta's Greenlight power project, the first phase of a major generating station built for data center demand.</description>
      <content:encoded>
        <![CDATA[<p>Aecon $1.2B EPC award launches construction of Alberta's Greenlight power project, the first phase of a major generating station built for data center demand.</p>]]>
      </content:encoded>
      <guid>http://www.enr.com/articles/63284</guid>
      <pubDate>Tue, 07 Jul 2026 08:20:00 -0400</pubDate>
      <link>https://www.enr.com/articles/63284-aecon-wins-12b-epc-contract-for-alberta-gas-fired-power-plant</link>
      <enclosure url="https://www.enr.com/ext/resources/2026/07/07/Alberta---AECOME-Gas-Powered-Plant.webp?t=1783425620" type="image/jpeg" length="216120"/>
    </item>
    <item>
      <title>D.C.'s RFK Campus Master Plan Maps Streets, Transit and Utility Work</title>
      <author>gottliebb@enr.com (Bryan Gottlieb)</author>
      <description>What's beyond the stadium? D.C.'s RFK master plan lays out the transportation, utility and riverfront framework that would reshape the 180-acre campus over the next decade.</description>
      <content:encoded>
        <![CDATA[<p>What's beyond the stadium? D.C.'s RFK master plan lays out the transportation, utility and riverfront framework that would reshape the 180-acre campus over the next decade.</p>]]>
      </content:encoded>
      <guid>http://www.enr.com/articles/63263</guid>
      <pubDate>Thu, 02 Jul 2026 12:03:54 -0400</pubDate>
      <link>https://www.enr.com/articles/63263-dcs-rfk-campus-master-plan-maps-streets-transit-and-utility-work</link>
      <enclosure url="https://www.enr.com/ext/resources/2026/07/02/RFK-Master-Plan-1.webp?t=1783004801" type="image/jpeg" length="298794"/>
    </item>
    <item>
      <title>Semi-Conductor Market Going Strong</title>
      <description>SK hynix is advancing construction of its $3.8-billion semiconductor hub in Indiana, marking a major step in expanding advanced chip manufacturing in the U.S. The facility will be the company's first manufacturing site outside Asia and is backed by federal CHIPS Act funding.</description>
      <content:encoded>
        <![CDATA[<p>SK hynix is advancing construction of its $3.8-billion semiconductor hub in Indiana, marking a major step in expanding advanced chip manufacturing in the U.S. The facility will be the company's first manufacturing site outside Asia and is backed by federal CHIPS Act funding.</p>]]>
      </content:encoded>
      <guid>http://www.enr.com/articles/63273</guid>
      <pubDate>Thu, 02 Jul 2026 00:00:00 -0400</pubDate>
      <link>https://www.enr.com/articles/63273-semi-conductor-market-going-strong</link>
      <enclosure url="https://www.enr.com/ext/resources/2026/07/02/skhynix_900x550_ENRWebReady.webp?t=1783024528" type="image/jpeg" length="122061"/>
    </item>
    <item>
      <title>HNTB, HDR, Kiewit Ready for 'Big Red Rebuild'</title>
      <author></author>
      <description>A $600-million overhaul of the University of Nebraska's Memorial Stadium is moving forward.</description>
      <content:encoded>
        <![CDATA[A $600-million overhaul of the University of Nebraska's Memorial Stadium is moving forward.]]>
      </content:encoded>
      <guid>http://www.enr.com/articles/63268</guid>
      <pubDate>Thu, 02 Jul 2026 00:00:00 -0400</pubDate>
      <link>https://www.enr.com/articles/63268-hntb-hdr-kiewit-ready-for-big-red-rebuild</link>
      <enclosure url="https://www.enr.com/ext/resources/2026/07/02/sKXWR2yz85QAjPHOrqPoHLc99GiM44kp7Gi5vctT_ENRready.webp?t=1783419400" type="image/jpeg" length="201466"/>
    </item>
    <item>
      <title>Hitachi Breaks Ground on $457M Va. Large Power Transformer Plant Expansion</title>
      <author>gottliebb@enr.com (Bryan Gottlieb)</author>
      <description>New public records reveal engineering details behind Hitachi Energy's $457M Virginia expansion, which will establish the country's biggest large power transformer plant.</description>
      <content:encoded>
        <![CDATA[<p>New public records reveal engineering details behind Hitachi Energy's $457M Virginia expansion, which will establish the country's biggest large power transformer plant.</p>]]>
      </content:encoded>
      <guid>http://www.enr.com/articles/63252</guid>
      <pubDate>Wed, 01 Jul 2026 11:34:44 -0400</pubDate>
      <link>https://www.enr.com/articles/63252-hitachi-breaks-ground-on-457m-va-large-power-transformer-plant-expansion</link>
      <enclosure url="https://www.enr.com/ext/resources/2026/07/01/Hitachi-Energy.webp?t=1782960778" type="image/jpeg" length="183279"/>
    </item>
    <item>
      <title>The Intriguing Backstories Behind the US Capitol Dome Construction</title>
      <author>kormanr@enr.com (Richard Korman)</author>
      <description>Despite tension between the iconic structure's architect and engineer, the result is a building for the ages.</description>
      <content:encoded>
        <![CDATA[<p>Despite tension between the iconic structure's architect and engineer, the result is a building for the ages.</p>]]>
      </content:encoded>
      <guid>http://www.enr.com/articles/63245</guid>
      <pubDate>Wed, 01 Jul 2026 08:34:10 -0400</pubDate>
      <link>https://www.enr.com/articles/63245-the-intriguing-backstories-behind-the-us-capitol-dome-construction</link>
      <enclosure url="https://www.enr.com/ext/resources/2026/06/30/The-U.S.-Capitol.webp?t=1783045726" type="image/jpeg" length="122832"/>
    </item>
    <item>
      <title>Minnesota Zoo Project Makes Nature the Focus</title>
      <author>manniona@enr.com (Annemarie Mannion)</author>
      <description>Minnesota Zoo replaces a 50-year-old arrival area with a $14.2M outdoor plaza, exhibit space and waterfront restoration.</description>
      <content:encoded>
        <![CDATA[<p>Minnesota Zoo replaces a 50-year-old arrival area with a $14.2M outdoor plaza, exhibit space and waterfront restoration.</p>]]>
      </content:encoded>
      <guid>http://www.enr.com/articles/63226</guid>
      <pubDate>Mon, 29 Jun 2026 12:00:00 -0400</pubDate>
      <link>https://www.enr.com/articles/63226-minnesota-zoo-project-makes-nature-the-focus</link>
      <enclosure url="https://www.enr.com/ext/resources/Issues/Midwest_Issues/2026/July/Midwest-DigMinnesota-July2026-1.webp?t=1782494136" type="image/jpeg" length="300743"/>
    </item>
    <item>
      <title>Why Fortress-Like Cincinnati Tower Had to Go Down Slab by Slab</title>
      <author>manniona@enr.com (Annemarie Mannion)</author>
      <description>Crosley Tower, which has stood on the University of Cincinnati campus since the 1960s, is being dismantled.</description>
      <content:encoded>
        <![CDATA[<p>Crosley Tower, which has stood on the University of Cincinnati campus since the 1960s, is being dismantled.</p>]]>
      </content:encoded>
      <guid>http://www.enr.com/articles/63225</guid>
      <pubDate>Mon, 29 Jun 2026 12:00:00 -0400</pubDate>
      <link>https://www.enr.com/articles/63225-why-fortress-like-cincinnati-tower-had-to-go-down-slab-by-slab</link>
      <enclosure url="https://www.enr.com/ext/resources/2026/07/09/resizedCrosley-5-(002).webp?t=1783608523" type="image/jpeg" length="151055"/>
    </item>
    <item>
      <title>Ohio SMR Project Advances With PJM Filing, GE Reactor Deal</title>
      <author>gottliebb@enr.com (Bryan Gottlieb)</author>
      <description>Elementl’s proposed Ohio nuclear plant moves deeper into development with a PJM grid filing, GE reactor deal and 2030 construction target.</description>
      <content:encoded>
        <![CDATA[<p>Elementl’s proposed Ohio nuclear plant moves deeper into development with a PJM grid filing, GE reactor deal and 2030 construction target.</p>]]>
      </content:encoded>
      <guid>http://www.enr.com/articles/63237</guid>
      <pubDate>Mon, 29 Jun 2026 09:15:33 -0400</pubDate>
      <link>https://www.enr.com/articles/63237-ohio-smr-project-advances-with-pjm-filing-ge-reactor-deal</link>
      <enclosure url="https://www.enr.com/ext/resources/2026/06/28/Ohio-SMR-Project.webp?t=1783045726" type="image/jpeg" length="295669"/>
    </item>
    <item>
      <title>$26.2M North Texas EOC Debuts as World Cup Command Center</title>
      <author>kongv@enr.com (Vince Kong)</author>
      <description>Built for crisis but debuting on a global stage, Dallas County’s new emergency operations center is serving as the nerve center for World Cup–level security.</description>
      <content:encoded>
        <![CDATA[<p>Built for crisis but debuting on a global stage, Dallas County’s new emergency operations center is serving as the nerve center for World Cup–level security.</p>]]>
      </content:encoded>
      <guid>http://www.enr.com/articles/63234</guid>
      <pubDate>Fri, 26 Jun 2026 16:10:05 -0400</pubDate>
      <link>https://www.enr.com/articles/63234-262m-north-texas-eoc-debuts-as-world-cup-command-center</link>
      <enclosure url="https://www.enr.com/ext/resources/2026/06/26/Dallas-County-Emergency-Operations-Center_reduced-18.webp?t=1782942977" type="image/jpeg" length="539730"/>
    </item>
    <item>
      <title>Skanska Balfour Beatty JV Sues Surety Over Microsoft Campus Cladding Claim</title>
      <author>kormanr@enr.com (Richard Korman)</author>
      <description>A subcontractor terminated from the project cites Ukraine war supply chain and labor woes.</description>
      <content:encoded>
        <![CDATA[A subcontractor terminated from the project cites Ukraine war supply chain and labor woes.]]>
      </content:encoded>
      <guid>http://www.enr.com/articles/63218</guid>
      <pubDate>Thu, 25 Jun 2026 14:04:25 -0400</pubDate>
      <link>https://www.enr.com/articles/63218-skanska-balfour-beatty-jv-sues-surety-over-microsoft-campus-cladding-claim</link>
      <enclosure url="https://www.enr.com/ext/resources/2026/06/24/Microsoft-Redmond-campus-construction.webp?t=1782567445" type="image/png" length="1083496"/>
    </item>
    <item>
      <title>$1B-$2B Toronto Hospital Tower Moves Ahead in Procurement</title>
      <author>gottliebb@enr.com (Bryan Gottlieb)</author>
      <description>Four teams are competing to build an 11-story patient care tower for North York General Hospital in Toronto.</description>
      <content:encoded>
        <![CDATA[<p>Four teams are competing to build an 11-story patient care tower for&nbsp;<span style=" font-style: normal; font-weight: 400; letter-spacing: normal; orphans: 2; text-align: left; widows: 2; word-spacing: 0px; display: inline !important; float: none;">North York General Hospital in Toronto.</span></p>]]>
      </content:encoded>
      <guid>http://www.enr.com/articles/63208</guid>
      <pubDate>Mon, 22 Jun 2026 21:26:46 -0400</pubDate>
      <link>https://www.enr.com/articles/63208-1b-2b-toronto-hospital-tower-moves-ahead-in-procurement</link>
      <enclosure url="https://www.enr.com/ext/resources/2026/06/22/North-York-Gen-Hospital.webp?t=1782162302" type="image/jpeg" length="131726"/>
    </item>
    <item>
      <title>33,000-Seat Tennis Center With Retractable-Roof Venues Planned in Saudi Arabia</title>
      <author>gottliebb@enr.com (Bryan Gottlieb)</author>
      <description>Saudi Arabia's Qiddiya City has unveiled plans for a 33,000-seat tennis center featuring retractable roofs, mountain-site construction challenges and a global design team.</description>
      <content:encoded>
        <![CDATA[<p>Saudi Arabia's Qiddiya City has unveiled plans for a 33,000-seat tennis center featuring retractable roofs, mountain-site construction challenges and a global design team.</p>]]>
      </content:encoded>
      <guid>http://www.enr.com/articles/63199</guid>
      <pubDate>Fri, 19 Jun 2026 14:56:45 -0400</pubDate>
      <link>https://www.enr.com/articles/63199-33-000-seat-tennis-center-with-retractable-roof-venues-planned-in-saudi-arabia</link>
      <enclosure url="https://www.enr.com/ext/resources/2026/06/19/Saudi-National-Tennis-Centre.webp?t=1781960145" type="image/jpeg" length="227566"/>
    </item>
    <item>
      <title>JetZero Starts Work on $4.7B Greensboro, N.C., Aircraft Campus</title>
      <author>gottliebb@enr.com (Bryan Gottlieb)</author>
      <description>JetZero's $4.7-billion Greensboro, N.C., aircraft campus will require massive site work, capping a 15-year airport strategy to attract aerospace manufacturing.</description>
      <content:encoded>
        <![CDATA[<p>JetZero's $4.7-billion Greensboro, N.C., aircraft campus will require massive site work, capping a 15-year airport strategy to attract aerospace manufacturing.</p>]]>
      </content:encoded>
      <guid>http://www.enr.com/articles/63189</guid>
      <pubDate>Thu, 18 Jun 2026 10:23:24 -0400</pubDate>
      <link>https://www.enr.com/articles/63189-jetzero-starts-work-on-47b-greensboro-nc-aircraft-campus</link>
      <enclosure url="https://www.enr.com/ext/resources/2026/06/18/JetZero.webp?t=1781868711" type="image/jpeg" length="275550"/>
    </item>
    <item>
      <title>NJ Punts on Enacting Tougher Coastal Development Rules </title>
      <description>Under new Gov. Mikie Sherrill (D), the Resilient Environments and Landscapes rule (REAL) now has one-year reprieve from July 20 before it mandates higher shorebuilding elevations and other requirements for high-risk area—giving pro and con forces more time to battle over likely amendments.</description>
      <content:encoded>
        <![CDATA[<p>Under new Gov. Mikie Sherrill (D), the Resilient Environments and Landscapes rule (REAL) now has one-year reprieve from July 20 before it mandates higher shorebuilding elevations and other requirements for high-risk area—giving pro and con forces more time to battle over likely amendments.&nbsp;</p>]]>
      </content:encoded>
      <guid>http://www.enr.com/articles/63188</guid>
      <pubDate>Wed, 17 Jun 2026 17:59:00 -0400</pubDate>
      <link>https://www.enr.com/articles/63188-nj-punts-on-enacting-tougher-coastal-development-rules</link>
      <enclosure url="https://www.enr.com/ext/resources/2026/06/17/Superstorm_Sandy_New_Jersey_ENRwebready.webp?t=1781735020" type="image/jpeg" length="288443"/>
    </item>
    <item>
      <title>Obama Center Opens The Doors as Subcontractors Say Invoices Remain Unpaid</title>
      <author>yodersj@enr.com (Jeff Yoders)</author>
      <description>Several union trade contractors say they have not been paid for their work on the Obama Presidential Center project in Chicago.</description>
      <content:encoded>
        <![CDATA[<p>Several union trade contractors say they have not been paid for their work on the Obama Presidential Center project in Chicago.&nbsp;</p>]]>
      </content:encoded>
      <guid>http://www.enr.com/articles/63172</guid>
      <pubDate>Tue, 16 Jun 2026 16:47:54 -0400</pubDate>
      <link>https://www.enr.com/articles/63172-obama-center-opens-the-doors-as-subcontractors-say-invoices-remain-unpaid</link>
      <enclosure url="https://www.enr.com/ext/resources/2025/09/30/Obama-Library-(2)-Resized.webp?t=1781626089" type="image/jpeg" length="119950"/>
    </item>
    <item>
      <title>Bechtel Award Advances Micron $100B New York Megafab Toward First Construction</title>
      <author>gottliebb@enr.com (Bryan Gottlieb)</author>
      <description>After years of planning and site work, Micron's New York semiconductor megaproject enters a new phase with Bechtel at the helm.</description>
      <content:encoded>
        <![CDATA[<p>After years of planning and site work, Micron's New York semiconductor megaproject enters a new phase with Bechtel at the helm.</p>]]>
      </content:encoded>
      <guid>http://www.enr.com/articles/63140</guid>
      <pubDate>Thu, 11 Jun 2026 13:00:40 -0400</pubDate>
      <link>https://www.enr.com/articles/63140-bechtel-award-advances-micron-100b-new-york-megafab-toward-first-construction</link>
      <enclosure url="https://www.enr.com/ext/resources/2026/06/10/Micron-Fab-Plant---Bechtel.webp?t=1781367127" type="image/jpeg" length="246816"/>
    </item>
    <item>
      <title>Mamdani's Comprehensive Affordable Housing Plan Sets Big Goals for New York City</title>
      <description>The Mamdani administration detailed strategies for increasing affordable housing, including building more than 200,000 affordable units in the next decade.</description>
      <content:encoded>
        <![CDATA[<p>The Mamdani administration detailed strategies for increasing affordable housing, including building more than 200,000 affordable units in the next decade.&nbsp;</p>]]>
      </content:encoded>
      <guid>http://www.enr.com/articles/63136</guid>
      <pubDate>Wed, 10 Jun 2026 14:30:31 -0400</pubDate>
      <link>https://www.enr.com/articles/63136-mamdanis-comprehensive-affordable-housing-plan-sets-big-goals-for-new-york-city</link>
      <enclosure url="https://www.enr.com/ext/resources/2025/11/21/Lower_Manhattan_Skyline_2025_010.webp?t=1781116220" type="image/jpeg" length="149315"/>
    </item>
    <item>
      <title>Boeing Plans $1B Investment in New Buildings and Renovations in  Wichita, Kan. </title>
      <author>manniona@enr.com (Annemarie Mannion)</author>
      <description>Boeing's planned $1-billion investment comes after its recent return to manufacturing operations in Wichita, Kan.</description>
      <content:encoded>
        <![CDATA[<p>Boeing's planned $1-billion investment comes after its recent return to manufacturing operations in Wichita, Kan.</p>]]>
      </content:encoded>
      <guid>http://www.enr.com/articles/63132</guid>
      <pubDate>Wed, 10 Jun 2026 12:00:00 -0400</pubDate>
      <link>https://www.enr.com/articles/63132-boeing-plans-1b-investment-in-new-buildings-and-renovations-in-wichita-kansas</link>
      <enclosure url="https://www.enr.com/ext/resources/2026/06/10/resizedwichita.webp?t=1781367127" type="image/jpeg" length="68814"/>
    </item>
    <item>
      <title>Vancouver Amphitheater Pushes Mass Timber Into Long-Span Territory </title>
      <author>gottliebb@enr.com (Bryan Gottlieb)</author>
      <description>Can mass timber compete in large public venues? Engineers of the Freedom Mobile Arch in British Columbia say it's possible.</description>
      <content:encoded>
        <![CDATA[<p>Can mass timber compete in large public venues? Engineers of the Freedom Mobile Arch in British Columbia say it's possible.</p>]]>
      </content:encoded>
      <guid>http://www.enr.com/articles/63118</guid>
      <pubDate>Mon, 08 Jun 2026 15:30:40 -0400</pubDate>
      <link>https://www.enr.com/articles/63118-vancouver-amphitheater-pushes-mass-timber-into-long-span-territory</link>
      <enclosure url="https://www.enr.com/ext/resources/2026/06/08/Freedom-Arch-Venue.webp?t=1781035256" type="image/jpeg" length="268356"/>
    </item>
    <item>
      <title>Chicago Bears Advance Planned Move to Indiana for New Football Stadium</title>
      <author>manniona@enr.com (Annemarie Mannion)</author>
      <description>NFL team signals that it intends to relocate to northwest Indiana to a proposed multibillion-dollar domed stadium.</description>
      <content:encoded>
        <![CDATA[<p>NFL team signals that it intends to relocate to northwest Indiana to a proposed multibillion-dollar domed stadium.</p>]]>
      </content:encoded>
      <guid>http://www.enr.com/articles/63115</guid>
      <pubDate>Fri, 05 Jun 2026 16:15:56 -0400</pubDate>
      <link>https://www.enr.com/articles/63115-chicago-bears-advance-planned-move-to-indiana-for-new-football-stadium</link>
      <enclosure url="https://www.enr.com/ext/resources/2026/06/05/resizedSolider_Field_Chicago_Bears_ENRwebready.webp?t=1780922254" type="image/jpeg" length="203995"/>
    </item>
    <item>
      <title>Trump Independence Arch Advances to NCPC Review as Ballroom Appeal Nears</title>
      <author>gottliebb@enr.com (Bryan Gottlieb)</author>
      <description>The proposed commemorative arch in Washington D.C., has received approval from the U.S. Commission of Fine Arts and is now under review by the National Capital Planning Commission, even as a federal judge weighs a lawsuit seeking to halt the project.</description>
      <content:encoded>
        <![CDATA[<p>The proposed commemorative arch in Washington D.C., has received approval from the U.S. Commission of Fine Arts and is now under review by the National Capital Planning Commission, even as a federal judge weighs a lawsuit seeking to halt the project.</p>]]>
      </content:encoded>
      <guid>http://www.enr.com/articles/63089</guid>
      <pubDate>Tue, 02 Jun 2026 16:08:34 -0400</pubDate>
      <link>https://www.enr.com/articles/63089-trump-independence-arch-advances-to-ncpc-review-as-ballroom-appeal-nears</link>
      <enclosure url="https://www.enr.com/ext/resources/2026/06/02/Trump-Arch-2.webp?t=1780483151" type="image/jpeg" length="189045"/>
    </item>
    <item>
      <title>Halmar, Skanska Advance Penn Station Rebuild as Delivery Phase Begins</title>
      <author>gottliebb@enr.com (Bryan Gottlieb)</author>
      <description>After months of delays, Amtrak and US DOT names joint venture as master developer to inherit active-rail construction, single-level concourse conversion and complex staging beneath Madison Square Garden in Manhattan.</description>
      <content:encoded>
        <![CDATA[<p>After months of delays, Amtrak and US DOT names joint venture as master developer to inherit active-rail construction, single-level concourse conversion and complex staging beneath Madison Square Garden in Manhattan.</p>]]>
      </content:encoded>
      <guid>http://www.enr.com/articles/63038</guid>
      <pubDate>Thu, 21 May 2026 11:27:55 -0400</pubDate>
      <link>https://www.enr.com/articles/63038-halmar-skanska-advance-penn-station-rebuild-as-delivery-phase-begins</link>
      <enclosure url="https://www.enr.com/ext/resources/2026/05/21/Penn-Station-JV-Announcement.webp?t=1779446750" type="image/jpeg" length="385957"/>
    </item>
    <item>
      <title>STV-Turner JV to Oversee Midtown Manhattan Bus Terminal Phase 1 Work</title>
      <author>gottliebb@enr.com (Bryan Gottlieb)</author>
      <description>Role covers interim terminal, storage facility and rail-spanning ramp structure tied to $10-billion replacement program</description>
      <content:encoded>
        <![CDATA[<p>Role covers interim terminal, storage facility and rail-spanning ramp structure tied to $10-billion replacement program</p><br>]]>
      </content:encoded>
      <guid>http://www.enr.com/articles/63030</guid>
      <pubDate>Wed, 20 May 2026 14:53:52 -0400</pubDate>
      <link>https://www.enr.com/articles/63030-stv-turner-jv-to-oversee-midtown-manhattan-bus-terminal-phase-1-work</link>
      <enclosure url="https://www.enr.com/ext/resources/2026/05/20/Midtown-Bus-Terminal-Phase-1.webp?t=1779313263" type="image/jpeg" length="207294"/>
    </item>
    <item>
      <title>Investors Back US Renewable Energy Projects But Want Market Uncertainties Fixed</title>
      <author>rubind@enr.com (Debra K. Rubin)</author>
      <description>Investors and developers are bullish on clean energy to quickly meet nation's power demand surge, but federal actions that undermine projects and remain vague on tax credit rules, as well as slow connection to the grid, could hamper markets.</description>
      <content:encoded>
        <![CDATA[<p><span style="font-size: 14px;"><span style="font-family: Arial,Helvetica,sans-serif;">Investors and developers are bullish on clean energy to quickly meet nation's power demand surge, b</span></span><span style="font-size: 14px;"><span style="font-family: Arial,Helvetica,sans-serif;">ut federal actions that undermine projects and remain vague on tax credit rules, as well as slow connection to the grid, could hamper markets.</span></span></p>]]>
      </content:encoded>
      <guid>http://www.enr.com/articles/63027</guid>
      <pubDate>Wed, 20 May 2026 12:10:00 -0400</pubDate>
      <link>https://www.enr.com/articles/63027-investors-back-us-renewable-energy-projects-but-want-market-uncertainties-fixed</link>
      <enclosure url="https://www.enr.com/ext/resources/2026/05/20/2026ACOREnance-Forum-3-copy.webp?t=1780023154" type="image/jpeg" length="247073"/>
    </item>
    <item>
      <title>Life Science Building Boom Gives Way to a More Selective Market</title>
      <author>gottliebb@enr.com (Bryan Gottlieb)</author>
      <description>Five years after the COVID-19 pandemic prompted a life-science boom, contractors say demand is shifting toward biomanufacturing and specialized facilities as speculative lab development cools.</description>
      <content:encoded>
        <![CDATA[<p>Five years after the COVID-19 pandemic prompted a life-science boom, contractors say demand is shifting toward biomanufacturing and specialized facilities as speculative lab development cools.</p>]]>
      </content:encoded>
      <guid>http://www.enr.com/articles/63025</guid>
      <pubDate>Tue, 19 May 2026 18:59:15 -0400</pubDate>
      <link>https://www.enr.com/articles/63025-life-science-building-boom-gives-way-to-a-more-selective-market</link>
      <enclosure url="https://www.enr.com/ext/resources/2026/05/19/Life-Sciences-2.webp?t=1779903554" type="image/jpeg" length="300978"/>
    </item>
    <item>
      <title>Chicago's Water Tower Place Slated for $170M Makeover </title>
      <author>manniona@enr.com (Annemarie Mannion)</author>
      <description>Will the planned renovation of the city's downtown mall, which opened in 1975, bring shoppers and new users back to the landmark building?</description>
      <content:encoded>
        <![CDATA[<p>Will the planned renovation of the city's downtown mall, which opened in 1975, bring shoppers and new users back to the landmark building?</p>]]>
      </content:encoded>
      <guid>http://www.enr.com/articles/63017</guid>
      <pubDate>Tue, 19 May 2026 10:00:00 -0400</pubDate>
      <link>https://www.enr.com/articles/63017-chicagos-water-tower-place-slated-for-170m-makeover</link>
      <enclosure url="https://www.enr.com/ext/resources/2026/05/18/WaterTowerinChicagojpg.webp?t=1779200027" type="image/jpeg" length="164291"/>
    </item>
    <item>
      <title>White House Ballroom Allocation Hits Snag in Senate, Adding New Uncertainty</title>
      <author>gottliebb@enr.com (Bryan Gottlieb)</author>
      <description>Senate Republicans are revising White House security funding after a procedural setback, adding uncertainty to an already contested project</description>
      <content:encoded>
        <![CDATA[<p>Senate Republicans are revising White House security funding after a procedural setback, adding uncertainty to an already contested project&nbsp;</p>]]>
      </content:encoded>
      <guid>http://www.enr.com/articles/63010</guid>
      <pubDate>Mon, 18 May 2026 10:13:00 -0400</pubDate>
      <link>https://www.enr.com/articles/63010-white-house-ballroom-allocation-hits-snag-in-senate-adding-new-uncertainty</link>
      <enclosure url="https://www.enr.com/ext/resources/2026/05/18/Thune---Ballroom-Funding.webp?t=1779446751" type="image/jpeg" length="103182"/>
    </item>
  </channel>
</rss>
