Under the radar, behind the project gate, inside the executive suite. That's where ENR's editors and bloggers deliver their insights, opinions, cool-headed analysis and hot-headed rantings.
In a big break with tradition, AIA’s board of directors approved a proposal to revise eligibility criteria for the group's prestigious Gold Medal award to include either an individual or two individuals working together.
The need for collaboration among construction project team members but the difficulty of getting people to share ideas was a continuing theme among speakers and attendees at the European Construction Institute conference June 13-14 in London.
The American Institute of Architects has announced additions and updates to its model contract documents and guides, including for BIM and digital practice.. .
NYC's Building Resiliency TaskForce has 33 climate adaptation proposals that echo almost every other report issued since Superstorm Sandy. The code-change recommendations apply mostly to new buildings and major renovations, making existing buildings (and their occupants) like sitting ducks.
KONE has introduced an elevator system that uses ultra-lite cables, with a carbon-fiber core, that the lift maker says will enable future travel heights of 1 kilometer, which is twice the distance currently possible.
On June 10, elevator maker KONE will introduce a new vertical transportation system for supertall towers that it promises will revolutionize the future of building design and urban living.
Recent Comments
A heartfelt and powerful message
https://syedconsultancy.com/
Congratulations Kyle!
Construction Burnout
Construction burnout