Building a 775,000-sq-ft casino and entertainment venue on a tight urban location included rehabilitating, renovating and reimagining some 20 buildings, including historic buildings that stood on the site for more than a century.
Working with limited info from original drawings and having limited access for field verification were ongoing challenges for this complex project that transformed five interconnected historic buildings into a modern urban campus.
Site logistics and phasing were major challenges for this $24-million middle school project that combines the campus’ original 1890’s farmhouse with a modern addition to create a dynamic and flexible learning environment.