Under heavy supervision from more than 80 top executives at Hyundai, the project team delivered two manufacturing facilities that will produce drive systems for Hyundai’s EV cars built in Georgia and Alabama.
Accommodating 2,500 vehicles, the expansive 860,000-sq-ft structure features a double-helix ramping system with one-way traffic flow. This design helps reduce travel times and creates a seamless entry and exit experience for motorists.
The new elementary school was designed with 31 adaptable learning environments to support interdisciplinary collaboration and evolving pedagogical approaches.
The $274.5-million design-build project completes a 25-mile beltway with a new directional system interchange that reduces bridge maintenance by 50% and eliminates problematic merge and weave areas.
This one-of-a-kind, 95,000-sq-ft facility will support training, repairs and calibration for hydrologic equipment that monitors stream flow, groundwater, water quality and other water resource features.
The addition of 92 beds and more than 91,000 sq ft of space significantly increases Cape Fear Valley Medical Center’s inpatient capacity and helps alleviate emergency department delays.