Remodeling existing operational hospital space is a challenge for any team. This project transforms space within the University of Utah’s Women’s & Children’s Inpatient Nursing Services unit to provide a state-of-the-art newborn intensive care unit.
Goals for this library included integrating collections from two older branches into an inviting, accessible and sustainable 21st-century facility that better meets the demands of its growing service area.
The construction of this three-story, 68,000-sq-ft temple serves as a prototype for new temples built by The Church of Jesus Christ of Latter-day Saints, and it included an owner challenge to the project team to reduce costs and schedule by 20%.
Facing a stringent deadline to be ready for the first Utes football game of the 2021 season, the project team building this 6,000-seat addition to the stadium had to effectively manage a broad range of stakeholders to keep the project on track.
The project added a new station to the existing FrontRunner commuter rail system, which shares a corridor with the Union Pacific Railroad (UPRR) freight main line.
The 12 alluvial wells that supply the South Adams County Water and Sanitation District’s 66,000 customers produce severely hard water, requiring local homeowners to frequently replace plumbing and water heaters and purchase costly in-home softeners that release corrosive brine waste into the sewer.
The 270,000-sq-ft multipurpose arena is designed to maximize the student-athlete experience and enhance Colorado College’s ability to recruit the nation’s top high school hockey talent.
The Pikes Peak Visitor Center matches the beauty of the surrounding environment while also providing new ways to understand and enjoy the great outdoors.