This 855,000-sq-ft Amazon distribution center, located on 71 acres near the Las Vegas Motor Speedway, was finished in February after 10 months of work.
At more than 249,000 sq ft, this high-tech facility for Central Admixture Pharmacy Services produces non-patient-specific compounded sterile preparations, mostly for clinical applications.
CRRC MA Corp. committed in 2015 to build the 204,000-sq-ft assembly facility for Massachusetts Bay Transportation Authority’s next-gen rail cars, although the China-owned firm had yet to land contracts with the Los Angeles County Metropolitan Transportation Authority and Southeastern Pennsylvania Transportation Authority.
Stacy Scopano recently joined Skender — a vertically integrated design, construction and manufacturing firm based in Chicago — as chief technology officer.
Technology and mobile connectivity have gone a long way toward fixing problems with the traditional design and construction process, but only a business model with volume production can reduce risk and deliver results that can truly offset unexpected events.