Steve Underwood, project manager with joint venture MTI, is orchestrating the span-by-span lift and assembly sequence for superstructure erection on the $1.2-billion widening of the Huey P. Long Bridge over the Mississippi River at New Orleans. He is using on a huge scale novel construction methods to minimize rail, shipping and highway disruptions.